HTS Heading 6405

Other footwear

All 18 HTS codes under heading 6405 (other footwear), with their duty rates from the 2026 HTS Revision 23. General duty 2.5% to 12.5%.

Every line of heading 6405

  • 6405 Other footwear.
  • 6405.10.00 With uppers of leather or composition leather: General 10%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 20%.
  • 6405.10.00.30 For men (under: With uppers of leather or composition leather) (prs.).
  • 6405.10.00.60 For women (under: With uppers of leather or composition leather) (prs.).
  • 6405.10.00.90 Other (under: With uppers of leather or composition leather) (prs.).
  • 6405.20 With uppers of textile materials.
  • 6405.20.30 With uppers of vegetable fibers: General 7.5%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 35%.
  • 6405.20.30.30 For men (under: With uppers of vegetable fibers) (prs.).
  • 6405.20.30.60 For women (under: With uppers of vegetable fibers) (prs.).
  • 6405.20.30.70 For infants, as described in statistical note 2 to this chapter (prs.).
  • 6405.20.30.80 Other (under: With uppers of vegetable fibers) (prs.).
  • 6405.20.60 With soles and uppers of wool felt: General 2.5%; Special Free (AU,BH, CL,CO,E,IL,JO, KR,MA,OM, P,PA,PE,S,SG); Column 2 35%.
  • 6405.20.60.30 For men (459) (under: With soles and uppers of wool felt) (prs., kg).
  • 6405.20.60.60 For women (459) (under: With soles and uppers of wool felt) (prs., kg).
  • 6405.20.60.90 Other (459) (under: With soles and uppers of wool felt) (prs., kg).
  • 6405.20.90 Other (under: With uppers of textile materials): General 12.5%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 35%.
  • 6405.20.90.15 House slippers (under: Other) (prs.).
  • 6405.20.90.30 For men (under: Other) (prs.).
  • 6405.20.90.60 For women (under: Other) (prs.).
  • 6405.20.90.70 For infants, as described in statistical note 2 to this chapter (prs.).
  • 6405.20.90.80 Other (under: Other) (prs.).
  • 6405.90 Other (under: Other footwear).
  • 6405.90.20.00 Disposable footwear, designed for one-time use (prs.): General 3.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 6405.90.90 Other (under: Other): General 12.5%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 35%.
  • 6405.90.90.30 For infants, as described in statistical note 2 to this chapter (prs.).
  • 6405.90.90.60 Other (under: Other) (prs.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.