HTS Chapter 64
Footwear, gaiters and the like; parts of such articles
The 6 headings and 391 HTS codes of chapter 64 (footwear, gaiters and the like), with their duty rates from the 2026 HTS Revision 23.
The 6 headings of chapter 64
- 6401: Waterproof footwear with outer soles and uppers of rubber or plastics, the uppers of which are neither fixed to the sole nor assembled by stitching, riveting, nailing, screwing, plugging or similar processes (10 codes, General duty Free to 37.5%)
- 6402: Other footwear with outer soles and uppers of rubber or plastics (108 codes, General duty Free to 48%, some per unit)
- 6403: Footwear with outer soles of rubber, plastics, leather or composition leather and uppers of leather (93 codes, General duty Free to 10%)
- 6404: Footwear with outer soles of rubber, plastics, leather or composition leather and uppers of textile materials (129 codes, General duty 7.5% to 48%, some per unit)
- 6405: Other footwear (18 codes, General duty 2.5% to 12.5%)
- 6406: Parts of footwear (including uppers whether or not attached to soles other than outer soles); removable insoles, heel cushions and similar articles; gaiters, leggings and similar articles, and parts thereof (33 codes, General duty Free to 33.6%, some per unit)
Where it sits in the schedule
Chapter 64 is in Section XII of the Harmonized System, footwear, headgear and umbrellas (chapters 64 to 67). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.