HTS Heading 6601

Umbrellas and sun umbrellas (including walking-stick umbrellas, garden umbrellas and similar umbrellas)

All 3 HTS codes under heading 6601 (umbrellas and sun umbrellas), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.2%.

Every line of heading 6601

  • 6601 Umbrellas and sun umbrellas (including walking-stick umbrellas, garden umbrellas and similar umbrellas).
  • 6601.10.00.00 Garden or similar umbrellas (under: Umbrellas and sun umbrellas (including walking-stick umbrellas, garden umbrellas and similar umbrellas)) (doz.): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 6601.91.00.00 Having a telescopic shaft (under: Other) (doz.): General Free; Special none; Column 2 40%.
  • 6601.99.00.00 Other (under: Other) (doz.): General 8.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.