HTS Chapter 66
Umbrellas, sun umbrellas, walking sticks, seat-sticks, whips, riding-crops
The 3 headings and 8 HTS codes of chapter 66 (umbrellas and canes), with their duty rates from the 2026 HTS Revision 23.
The 3 headings of chapter 66
- 6601: Umbrellas and sun umbrellas (including walking-stick umbrellas, garden umbrellas and similar umbrellas) (3 codes, General duty Free to 8.2%)
- 6602: Walking-sticks, seat-sticks, whips, riding-crops and the like (1 code, General duty 4%)
- 6603: Parts, trimmings and accessories of articles of heading 6601 or 6602 (4 codes, General duty Free to 12%)
Where it sits in the schedule
Chapter 66 is in Section XII of the Harmonized System, footwear, headgear and umbrellas (chapters 64 to 67). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.