HTS Heading 6603
Parts, trimmings and accessories of articles of heading 6601 or 6602
All 4 HTS codes under heading 6603 (parts), with their duty rates from the 2026 HTS Revision 23. General duty Free to 12%.
Every line of heading 6603
- 6603 Parts, trimmings and accessories of articles of heading 6601 or 6602.
- 6603.20 Umbrella frames, including frames mounted on shafts (sticks).
- 6603.20.30.00 For hand-held umbrellas chiefly used for protection against rain (No.): General Free; Special none; Column 2 60%.
- 6603.20.90.00 Other (under: Umbrella frames, including frames mounted on shafts (sticks)) (No.): General 12%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 6603.90 Other (under: Parts, trimmings and accessories of articles of heading 6601 or 6602).
- 6603.90.41.00 Umbrella handles, knobs, tips and caps (kg): General Free; Special none; Column 2 45%.
- 6603.90.81.00 Other (under: Other) (kg): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.