HTS Heading 6702

Artificial flowers, foliage and fruit and parts thereof; articles made of artificial flowers, foliage or fruit

All 5 HTS codes under heading 6702 (artificial flowers), with their duty rates from the 2026 HTS Revision 23. General duty 3.4% to 17%.

Every line of heading 6702

  • 6702 Artificial flowers, foliage and fruit and parts thereof; articles made of artificial flowers, foliage or fruit.
  • 6702.10 Of plastics (under: Artificial flowers, foliage and fruit and parts thereof; articles made of artificial flowers, foliage or fruit).
  • 6702.10.20.00 Assembled by binding with flexible materials such as wire, paper, textile materials, or foil, or by gluing or by similar methods (No.): General 8.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 6702.10.40.00 Other, including parts (under: Of plastics) (No.): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 6702.90 Of other materials (under: Artificial flowers, foliage and fruit and parts thereof; articles made of artificial flowers, foliage or fruit).
  • 6702.90.10.00 Of feathers (under: Of other materials) (No.): General 4.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 6702.90.35.00 Of man-made fibers (under: Other) (No.): General 9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 71.5%.
  • 6702.90.65.00 Other (under: Other) (No.): General 17%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 90%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.