HTS Chapter 67
Prepared feathers and down; artificial flowers; articles of human hair
The 4 headings and 13 HTS codes of chapter 67 (prepared feathers and down), with their duty rates from the 2026 HTS Revision 23.
The 4 headings of chapter 67
- 6701: Skins and other parts of birds with their feathers or down, feathers, parts of feathers, down and articles thereof (other than goods of heading 0505 and worked quills and scapes) (2 codes, General duty 4.7%)
- 6702: Artificial flowers, foliage and fruit and parts thereof; articles made of artificial flowers, foliage or fruit (5 codes, General duty 3.4% to 17%)
- 6703: Human hair, dressed, thinned, bleached or otherwise worked; wool or other animal hair or other textile materials, prepared for use in making wigs or the like (2 codes, General duty Free)
- 6704: Wigs, false beards, eyebrows and eyelashes, switches and the like, of human or animal hair or of textile materials; articles of human hair not elsewhere specified or included (4 codes, General duty Free)
Where it sits in the schedule
Chapter 67 is in Section XII of the Harmonized System, footwear, headgear and umbrellas (chapters 64 to 67). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.