HTS Heading 6704

Wigs, false beards, eyebrows and eyelashes, switches and the like, of human or animal hair or of textile materials; articles of human hair not elsewhere specified or included

All 4 HTS codes under heading 6704 (wigs, false beards, eyebrows and eyelashes), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 6704

  • 6704 Wigs, false beards, eyebrows and eyelashes, switches and the like, of human or animal hair or of textile materials; articles of human hair not elsewhere specified or included.
  • 6704.11.00.00 Complete wigs (under: Of synthetic textile materials) (No.): General Free; Special none; Column 2 35%.
  • 6704.19.00.00 Other (under: Of synthetic textile materials) (No.): General Free; Special none; Column 2 35%.
  • 6704.20.00.00 Of human hair (under: Wigs, false beards, eyebrows and eyelashes, switches and the like, of human or animal hair or of textile materials; articles of human hair not elsewhere specified or included) (No.): General Free; Special none; Column 2 35%.
  • 6704.90.00.00 Of other materials (under: Wigs, false beards, eyebrows and eyelashes, switches and the like, of human or animal hair or of textile materials; articles of human hair not elsewhere specified or included) (No.): General Free; Special none; Column 2 35%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.