HTS Heading 6809

Articles of plaster or of compositions based on plaster

All 4 HTS codes under heading 6809 (articles of plaster), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3%.

Every line of heading 6809

  • 6809 Articles of plaster or of compositions based on plaster.
  • 6809.11.00 Faced or reinforced with paper or paperboard only: General Free; Special none; Column 2 30%.
  • 6809.11.00.10 Of gypsum plaster (under: Faced or reinforced with paper or paperboard only) (kg, m2).
  • 6809.11.00.80 Other (under: Faced or reinforced with paper or paperboard only) (kg, m2).
  • 6809.19.00.00 Other (under: Boards, sheets, panels, tiles and similar articles, not ornamented) (m2): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 6809.90.00.00 Other articles (under: Articles of plaster or of compositions based on plaster) (kg): General Free; Special none; Column 2 60%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.