HTS Heading 6810

Articles of cement, of concrete or of artificial stone, whether or not reinforced

All 9 HTS codes under heading 6810 (articles of cement), with their duty rates from the 2026 HTS Revision 23. General duty Free to 9%.

Every line of heading 6810

  • 6810 Articles of cement, of concrete or of artificial stone, whether or not reinforced.
  • 6810.11.00 Building blocks and bricks (under: Tiles, flagstones, bricks and similar articles): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 6810.11.00.10 Containing by weight more than 70 percent magnesia, expressed as MgO, with carbon content ranging from trace amounts to less than 30 percent, and chemically bonded by resin or pitch (m2).
  • 6810.11.00.70 Other (under: Building blocks and bricks) (t).
  • 6810.19 Other (under: Tiles, flagstones, bricks and similar articles).
  • 6810.19.12.00 Of stone agglomerated with binders other than cement (m2): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 6810.19.14.00 Other (under: Floor and wall tiles) (m2): General 9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6810.19.50.00 Other (under: Other) (t): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 6810.91.00.00 Prefabricated structural components for building or civil engineering (t): General Free; Special none; Column 2 30%.
  • 6810.99.00 Other (under: Other articles): General Free; Special none; Column 2 30%.
  • 6810.99.00.20 In slabs of rectangular shape, with a length of 3 m or more and a width of 1.25 m or more (m2).
  • 6810.99.00.40 Other (under: Agglomerated quartz slabs of the type used for countertops) (m2).
  • 6810.99.00.80 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.