HTS Heading 6813

Friction material and articles thereof (for example, sheets, rolls, strips, segments, discs, washers, pads), not mounted, for brakes, for clutches or the like, with a basis of asbestos, of other mineral substances or of cellulose, whether or not combined with textile or other materials

All 8 HTS codes under heading 6813 (friction material and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 6813

  • 6813 Friction material and articles thereof (for example, sheets, rolls, strips, segments, discs, washers, pads), not mounted, for brakes, for clutches or the like, with a basis of asbestos, of other mineral substances or of cellulose, whether or not combined with textile or other materials.
  • 6813.20.00 Containing asbestos (under: Friction material and articles thereof (for example, sheets, rolls, strips, segments, discs, washers, pads), not mounted, for brakes, for clutches or the like, with a basis of asbestos, of other mineral substances or of cellulose, whether or not combined with textile or other materials): General Free; Special none; Column 2 25%.
  • 6813.20.00.10 Articles for use in civil aircraft (No.).
  • 6813.20.00.15 Other (under: Brake linings and pads) (No.).
  • 6813.20.00.20 Articles for use in civil aircraft (No.).
  • 6813.20.00.25 Other (under: Other) (No.).
  • 6813.81.00 Brake linings and pads (under: Not containing asbestos): General Free; Special none; Column 2 25%.
  • 6813.81.00.10 Articles for use in civil aircraft, with a basis of mineral substances (No.).
  • 6813.81.00.50 Other (under: Brake linings and pads) (No.).
  • 6813.89.00 Other (under: Not containing asbestos): General Free; Special none; Column 2 25%.
  • 6813.89.00.10 Articles for use in civil aircraft, with a basis of mineral substances (No.).
  • 6813.89.00.50 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.