HTS Heading 6812

Fabricated asbestos fibers; mixtures with a basis of asbestos or with a basis of asbestos and magnesium carbonate; articles of such mixtures or of asbestos (for example, thread, woven fabric, clothing, headgear, footwear, gaskets), whether or not reinforced, other than goods of heading 6811 or 6813

All 7 HTS codes under heading 6812 (fabricated asbestos fibers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.3%.

Every line of heading 6812

  • 6812 Fabricated asbestos fibers; mixtures with a basis of asbestos or with a basis of asbestos and magnesium carbonate; articles of such mixtures or of asbestos (for example, thread, woven fabric, clothing, headgear, footwear, gaskets), whether or not reinforced, other than goods of heading 6811 or 6813.
  • 6812.80 Of crocidolite (under: Fabricated asbestos fibers; mixtures with a basis of asbestos or with a basis of asbestos and magnesium carbonate; articles of such mixtures or of asbestos (for example, thread, woven fabric, clothing, headgear, footwear, gaskets), whether or not reinforced, other than goods of heading 6811 or 6813).
  • 6812.80.10.00 Footwear (under: Of crocidolite) (kg): General 8.3%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 6812.80.90.00 Other (under: Of crocidolite) (kg): General Free; Special none; Column 2 35%.
  • 6812.91 Clothing, clothing accessories, footwear and headgear.
  • 6812.91.10.00 Footwear (under: Clothing, clothing accessories, footwear and headgear) (kg): General 8.3%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
  • 6812.91.90.00 Other (under: Clothing, clothing accessories, footwear and headgear) (kg): General Free; Special none; Column 2 35%.
  • 6812.99 Other (under: Other).
  • 6812.99.10.00 Paper, millboard and felt (under: Other) (m2): General Free; Special none; Column 2 25%.
  • 6812.99.20.00 Compressed asbestos fiber jointing, in sheets or rolls (m2): General Free; Special none; Column 2 25%.
  • 6812.99.90.00 Other (under: Other) (m2): General Free; Special none; Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.