HTS Heading 6902
Refractory bricks, blocks, tiles and similar refractory ceramic constructional goods, other than those of siliceous fossil meals or similar siliceous earths
All 10 HTS codes under heading 6902 (refractory bricks, blocks), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 6902
- 6902 Refractory bricks, blocks, tiles and similar refractory ceramic constructional goods, other than those of siliceous fossil meals or similar siliceous earths.
- 6902.10 Containing by weight, singly or together, more than 50 percent of the elements magnesium, calcium or chromium, expressed as MgO, CaO or Cr2O3.
- 6902.10.10.00 Magnesite bricks (under: Containing by weight, singly or together, more than 50 percent of the elements magnesium, calcium or chromium, expressed as MgO, CaO or Cr2O3) (thousands, t): General Free; Special none; Column 2 13%.
- 6902.10.50.00 Other (under: Containing by weight, singly or together, more than 50 percent of the elements magnesium, calcium or chromium, expressed as MgO, CaO or Cr2O3) (t): General Free; Special none; Column 2 30%.
- 6902.20 Containing by weight more than 50 percent of alumina (Al2O3), of silica (SiO2) or of a mixture or compound of these products.
- 6902.20.10 Bricks (under: Containing by weight more than 50 percent of alumina (Al2O3), of silica (SiO2) or of a mixture or compound of these products): General Free; Special none; Column 2 25%.
- 6902.20.10.10 Alumina (under: Bricks) (thousands, t).
- 6902.20.10.20 Other (under: Bricks) (thousands, t).
- 6902.20.50 Other (under: Containing by weight more than 50 percent of alumina (Al2O3), of silica (SiO2) or of a mixture or compound of these products): General Free; Special none; Column 2 30%.
- 6902.20.50.10 Alumina (under: Other) (t).
- 6902.20.50.20 Other (under: Other) (t).
- 6902.90 Other (under: Refractory bricks, blocks, tiles and similar refractory ceramic constructional goods, other than those of siliceous fossil meals or similar siliceous earths).
- 6902.90.10 Bricks (under: Other): General Free; Special none; Column 2 25%.
- 6902.90.10.10 Clay (under: Bricks) (thousands, t).
- 6902.90.10.20 Other (under: Bricks) (thousands, t).
- 6902.90.50 Other (under: Other): General Free; Special none; Column 2 30%.
- 6902.90.50.10 Clay (under: Other) (t).
- 6902.90.50.20 Other (under: Other) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.