HTS Chapter 69
Ceramic products
The 13 headings and 120 HTS codes of chapter 69 (ceramic products), with their duty rates from the 2026 HTS Revision 23.
The 13 headings of chapter 69
- 6901: Bricks, blocks, tiles and other ceramic goods of siliceous fossil meals (for example, kieselguhr, tripolite or diatomite) or of similar siliceous earths (1 code, General duty Free)
- 6902: Refractory bricks, blocks, tiles and similar refractory ceramic constructional goods, other than those of siliceous fossil meals or similar siliceous earths (10 codes, General duty Free)
- 6903: Other refractory ceramic goods (for example, retorts, crucibles, muffles, nozzles, plugs, supports, cupels, tubes, pipes, sheaths, rods and slide gates), other than those of siliceous fossil meals or of similar siliceous earths (4 codes, General duty Free)
- 6904: Ceramic building bricks, flooring blocks, support or filler tiles and the like (5 codes, General duty Free)
- 6905: Roofing tiles, chimney pots, cowls, chimney liners, architectural ornaments and other ceramic constructional goods (3 codes, General duty 3.2% to 13.5%)
- 6906: Ceramic pipes, conduits, guttering and pipe fittings (1 code, General duty Free)
- 6907: Ceramic flags and paving, hearth or wall tiles; ceramic mosaic cubes and the like, whether or not on a backing; finishing ceramics (40 codes, General duty 8.5% to 10%)
- 6909: Ceramic wares for laboratory, chemical or other technical uses; ceramic troughs, tubs and similar receptacles of a kind used in agriculture; ceramic pots, jars and similar articles of a kind used for the conveyance or packing of goods (7 codes, General duty Free to 4.5%)
- 6910: Ceramic sinks, washbasins, washbasin pedestals, baths, bidets, water closet bowls, flush tanks, urinals and similar sanitary fixtures (7 codes, General duty 5.7% to 5.8%)
- 6911: Tableware, kitchenware, other household articles and toilet articles, of porcelain or china (18 codes, General duty 5.4% to 26%)
- 6912: Ceramic tableware, kitchenware, other household articles and toilet articles, other than of porcelain or china (13 codes, General duty 0.7% to 28%)
- 6913: Statuettes and other ornamental ceramic articles (7 codes, General duty Free to 6%)
- 6914: Other ceramic articles (4 codes, General duty Free to 9%)
Where it sits in the schedule
Chapter 69 is in Section XIII of the Harmonized System, stone, ceramics and glass (chapters 68 to 70). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.