HTS Heading 6905

Roofing tiles, chimney pots, cowls, chimney liners, architectural ornaments and other ceramic constructional goods

All 3 HTS codes under heading 6905 (roofing tiles, chimney pots, cowls), with their duty rates from the 2026 HTS Revision 23. General duty 3.2% to 13.5%.

Every line of heading 6905

  • 6905 Roofing tiles, chimney pots, cowls, chimney liners, architectural ornaments and other ceramic constructional goods.
  • 6905.10.00.00 Roofing tiles (under: Roofing tiles, chimney pots, cowls, chimney liners, architectural ornaments and other ceramic constructional goods) (m2): General 13.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6905.90.00 Other (under: Roofing tiles, chimney pots, cowls, chimney liners, architectural ornaments and other ceramic constructional goods): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 6905.90.00.10 Heat insulating (under: Other) (No.).
  • 6905.90.00.50 Other (under: Other) (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.