HTS Heading 6907

Ceramic flags and paving, hearth or wall tiles; ceramic mosaic cubes and the like, whether or not on a backing; finishing ceramics

All 40 HTS codes under heading 6907 (ceramic flags and paving), with their duty rates from the 2026 HTS Revision 23. General duty 8.5% to 10%.

Every line of heading 6907

  • 6907 Ceramic flags and paving, hearth or wall tiles; ceramic mosaic cubes and the like, whether or not on a backing; finishing ceramics.
  • 6907.21 Of a water absorption coefficient by weight not exceeding 0.5%.
  • 6907.21.10 Unglazed (under: Of a water absorption coefficient by weight not exceeding 0.5%): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.21.10.05 Tiles, whether or not rectangular, the largest surface area of which is capable of being enclosed in a square the side of which is less than 7 cm (m2).
  • 6907.21.10.11 Tiles, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.21.10.51 Other (under: Other) (m2).
  • 6907.21.20.00 Having not over 3229 tiles per square meter, most of which have faces bounded entirely by straight lines (m2): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.21.30.00 The largest surface area of which is less than 38.7 cm2 (m2): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.21.40.00 Other (under: Other) (m2): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.21.90 Other (under: Glazed): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.21.90.11 Tiles, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.21.90.51 Other (under: Other) (m2).
  • 6907.22 Of water absorption coefficient by weight exceeding 0.5 percent but not exceeding 10 percent.
  • 6907.22.10 Unglazed (under: Of water absorption coefficient by weight exceeding 0.5 percent but not exceeding 10 percent): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.22.10.05 Tiles, whether or not rectangular, the largest surface area of which is capable of being enclosed in a square the side of which is less than 7 cm (m2).
  • 6907.22.10.11 Tiles, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.22.10.51 Other (under: Other) (m2).
  • 6907.22.20.00 Having not over 3229 tiles per square meter, most of which have faces bounded entirely by straight lines (m2): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.22.30.00 The largest surface area of which is less than 38.7 cm2 (m2): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.22.40.00 Other (under: Other) (m2): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.22.90 Other (under: Glazed): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.22.90.11 Tiles, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.22.90.51 Other (under: Other) (m2).
  • 6907.23 Of a water absorption coefficient by weight exceeding 10 percent.
  • 6907.23.10 Unglazed (under: Of a water absorption coefficient by weight exceeding 10 percent): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.23.10.05 Tiles, whether or not rectangular, the largest surface area of which is capable of being enclosed in a square the side of which is less than 7 cm (m2).
  • 6907.23.10.11 Tiles, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.23.10.51 Other (under: Other) (m2).
  • 6907.23.20.00 Having not over 3229 tiles per square meter, most of which have faces bounded entirely by straight lines (m2): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.23.30.00 The largest surface area of which is less than 38.7 cm2 (m2): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.23.40.00 Other (under: Other) (m2): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.23.90 Other (under: Glazed): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.23.90.11 Tiles, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.23.90.51 Other (under: Other) (m2).
  • 6907.30 Mosaic cubes and the like, other than those of subheading 6907.40.
  • 6907.30.10 Unglazed (under: Mosaic cubes and the like, other than those of subheading 6907.40): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.30.10.05 Cubes and the like, whether or not rectangular, the largest surface area of which is capable of being enclosed in a square the side of which is less than 7 cm (m2).
  • 6907.30.10.11 Cubes and the like, the largest surface area of which is capable of being enclosed in a square the side of which is 30cm or less (m2).
  • 6907.30.10.51 Other (under: Other) (m2).
  • 6907.30.20.00 Having not over 3229 cubes per square meter, most of which have straight lines (m2): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.30.30.00 The largest surface area of which is less than 38.7 cm2 (m2): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.30.40.00 Other (under: Other) (m2): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.30.90 Other (under: Glazed): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.30.90.11 Cubes and the like, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.30.90.51 Other (under: Other) (m2).
  • 6907.40 Finishing ceramics (under: Ceramic flags and paving, hearth or wall tiles; ceramic mosaic cubes and the like, whether or not on a backing; finishing ceramics).
  • 6907.40.10 Unglazed (under: Finishing ceramics): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.40.10.05 Finishing ceramics, whether or not rectangular, the largest surface area of which is capable of being enclosed in a square the side of which is less than 7 cm (m2).
  • 6907.40.10.11 Finishing ceramics, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.40.10.51 Other (under: Other) (m2).
  • 6907.40.20.00 Having not over 3229 finishing ceramics per square meter, most of which have faces bounded entirely by straight lines (m2): General 10%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.40.30.00 The largest surface area of which is less than 38.7 cm2 (m2): General 10%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.40.40.00 Other (under: Other) (m2): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.40.90 Other (under: Glazed): General 8.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 55%.
  • 6907.40.90.11 Finishing ceramics, the largest surface area of which is capable of being enclosed in a square the side of which is 30 cm or less (m2).
  • 6907.40.90.51 Other (under: Other) (m2).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.