HTS Heading 7018

Glass beads, imitation pearls, imitation precious or semiprecious stones and similar glass smallwares and articles thereof other than imitation jewelry; glass eyes other than prosthetic articles; statuettes and other ornaments of lamp-worked glass, other than imitation jewelry; glass microspheres not exceeding 1 mm in diameter

All 6 HTS codes under heading 7018 (glass beads, imitation pearls), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.6%.

Every line of heading 7018

  • 7018 Glass beads, imitation pearls, imitation precious or semiprecious stones and similar glass smallwares and articles thereof other than imitation jewelry; glass eyes other than prosthetic articles; statuettes and other ornaments of lamp-worked glass, other than imitation jewelry; glass microspheres not exceeding 1 mm in diameter.
  • 7018.10 Glass beads, imitation pearls, imitation precious or semiprecious stones and similar glass smallwares.
  • 7018.10.10.00 Imitation pearls and imitation pearl beads of all shapes and colors, drilled or not drilled, but not strung (except temporarily) and not set (kg): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 7018.10.20.00 Imitation precious or semiprecious stones (except imitation beads thereof) (kg): General Free; Special none; Column 2 20%.
  • 7018.10.50.00 Other (under: Glass beads, imitation pearls, imitation precious or semiprecious stones and similar glass smallwares) (kg): General Free; Special none; Column 2 40%.
  • 7018.20.00.00 Glass microspheres not exceeding 1 mm in diameter (kg): General 5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 7018.90 Other (under: Glass beads, imitation pearls, imitation precious or semiprecious stones and similar glass smallwares and articles thereof other than imitation jewelry; glass eyes other than prosthetic articles; statuettes and other ornaments of lamp-worked glass, other than imitation jewelry; glass microspheres not exceeding 1 mm in diameter).
  • 7018.90.10.00 Glass eyes, except prosthetic articles (kg): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 70%.
  • 7018.90.50.00 Other (under: Other) (kg): General 6.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.