HTS Chapter 70
Glass and glassware
The 19 headings and 280 HTS codes of chapter 70 (glass and glassware), with their duty rates from the 2026 HTS Revision 23.
The 19 headings of chapter 70
- 7001: Cullet and other waste and scrap of glass, excluding glass from cathode-ray tubes or other activated glass of heading 8549; glass in the mass (3 codes, General duty Free to 3%)
- 7002: Glass in balls (other than microspheres of heading 7018), rods or tubes, unworked (8 codes, General duty Free to 6%)
- 7003: Cast glass and rolled glass, in sheets or profiles, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked (4 codes, General duty 1.1% to 6.3%)
- 7004: Drawn glass and blown glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked (16 codes, General duty Free to 7.2%, some per unit)
- 7005: Float glass and surface ground or polished glass, in sheets, whether or not having an absorbent, reflecting or non-reflecting layer, but not otherwise worked (15 codes, General duty Free to 5.6%, some per unit)
- 7006: Glass of heading 7003, 7004 or 7005, bent, edge-worked, engraved, drilled, enameled or otherwise worked, but not framed or fitted with other materials (4 codes, General duty 4.9% to 8.8%)
- 7007: Safety glass, consisting of toughened (tempered) or laminated glass (7 codes, General duty 4.9% to 5.5%)
- 7008: Multiple-walled insulating units of glass (1 code, General duty 3.9%)
- 7009: Glass mirrors, whether or not framed, including rear-view mirrors (11 codes, General duty 3.9% to 7.8%)
- 7010: Carboys, bottles, flasks, jars, pots, vials, ampoules and other containers, of glass, of a kind used for the conveyance or packing of goods; preserving jars of glass; stoppers, lids and other closures, of glass (26 codes, General duty Free to 5.2%)
- 7011: Glass envelopes (including bulbs and tubes), open, and glass parts thereof, without fittings, for electric lamps and light sources, cathode-ray tubes or the like (8 codes, General duty Free to 6.6%)
- 7013: Glassware of a kind used for table, kitchen, toilet, office, indoor decoration or similar purposes (other than that of heading 7010 or 7018) (64 codes, General duty 3% to 38%)
- 7014: Signaling glassware and optical elements of glass (other than those of heading 7015), not optically worked (4 codes, General duty 3.3% to 5%)
- 7015: Clock or watch glasses and similar glasses, glasses for noncorrective or corrective spectacles, curved, bent, hollowed or the like, not optically worked; hollow glass spheres and their segments, for the manufacture of such glasses (4 codes, General duty Free)
- 7016: Paving blocks, slabs, bricks, squares, tiles and other articles of pressed or molded glass, whether or not wired, of a kind used for building or construction purposes; glass cubes and other glass smallwares, whether or not on a backing, for mosaics or similar decorative purposes; leaded glass windows and the like; multicellular or foam glass in blocks, panels, plates, shells or similar forms (4 codes, General duty 2.7% to 8%)
- 7017: Laboratory, hygienic or pharmaceutical glassware, whether or not graduated or calibrated (5 codes, General duty Free to 6.7%)
- 7018: Glass beads, imitation pearls, imitation precious or semiprecious stones and similar glass smallwares and articles thereof other than imitation jewelry; glass eyes other than prosthetic articles; statuettes and other ornaments of lamp-worked glass, other than imitation jewelry; glass microspheres not exceeding 1 mm in diameter (6 codes, General duty Free to 6.6%)
- 7019: Glass fibers (including glass wool) and articles thereof (for example, yarn, rovings, woven fabrics) (87 codes, General duty Free to 7.3%)
- 7020: Other articles of glass (3 codes, General duty Free to 6.6%)
Where it sits in the schedule
Chapter 70 is in Section XIII of the Harmonized System, stone, ceramics and glass (chapters 68 to 70). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.