HTS Heading 7108

Gold (including gold plated with platinum) unwrought or in semi-manufactured forms, or in powder form

All 10 HTS codes under heading 7108 (gold), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.1%.

Every line of heading 7108

  • 7108 Gold (including gold plated with platinum) unwrought or in semi-manufactured forms, or in powder form.
  • 7108.11.00.00 Powder (under: Nonmonetary) (g): General Free; Special none; Column 2 Free.
  • 7108.12 Other unwrought forms (under: Nonmonetary).
  • 7108.12.10 Bullion and dore (under: Other unwrought forms): General Free; Special none; Column 2 Free.
  • 7108.12.10.13 Containing by weight not less than 99.95 percent of gold (Au g).
  • 7108.12.10.17 Other (under: Bullion) (Au g).
  • 7108.12.10.20 Dore (under: Bullion and dore) (Au g).
  • 7108.12.50 Other (under: Other unwrought forms): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7108.12.50.10 Containing by weight not less than 99.95 percent of gold (Au g).
  • 7108.12.50.50 Other (under: Other) (Au g).
  • 7108.13 Other semimanufactured forms (under: Nonmonetary).
  • 7108.13.10.00 Gold leaf (under: Other semimanufactured forms) (cm2, Au g): General Free; Special none; Column 2 8%.
  • 7108.13.55.00 Rectangular or near rectangular shapes, containing 99.5 percent or more by weight of gold and not otherwise marked or decorated than with weight, purity, or other identifying information (g): General Free; Special none; Column 2 Free.
  • 7108.13.70.00 Other (under: Other) (g): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
  • 7108.20.00.00 Monetary (under: Gold (including gold plated with platinum) unwrought or in semi-manufactured forms, or in powder form) (g): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.