HTS Chapter 71
Pearls, precious or semiprecious stones, precious metals and articles thereof; imitation jewelry; coin
The 18 headings and 140 HTS codes of chapter 71 (jewelry and precious metals), with their duty rates from the 2026 HTS Revision 23.
The 18 headings of chapter 71
- 7101: Pearls, natural or cultured, whether or not worked or graded but not strung, mounted or set; pearls, natural or cultured, temporarily strung for convenience of transport (5 codes, General duty Free)
- 7102: Diamonds, whether or not worked, but not mounted or set (11 codes, General duty Free)
- 7103: Precious stones (other than diamonds) and semiprecious stones, whether or not worked or graded but not strung, mounted or set; ungraded precious stones (other than diamonds) and semiprecious stones, temporarily strung for convenience of transport (7 codes, General duty Free to 10.5%)
- 7104: Synthetic or reconstructed precious or semiprecious stones, whether or not worked or graded but not strung, mounted or set; ungraded synthetic or reconstructed precious or semiprecious stones, temporarily strung for convenience of transport (7 codes, General duty Free to 6.4%)
- 7105: Dust and powder of natural or synthetic precious or semi- precious stones (6 codes, General duty Free)
- 7106: Silver (including silver plated with gold or platinum), unwrought or in semimanufactured forms, or in powder form (6 codes, General duty Free to 3%)
- 7107: Base metals clad with silver, not further worked than semi- manufactured (1 code, General duty 3.3%)
- 7108: Gold (including gold plated with platinum) unwrought or in semi-manufactured forms, or in powder form (10 codes, General duty Free to 4.1%)
- 7109: Base metals or silver, clad with gold, not further worked than semimanufactured (1 code, General duty 6%)
- 7110: Platinum, unwrought or in semimanufactured forms, or in powder form (14 codes, General duty Free)
- 7111: Base metals, silver or gold, clad with platinum, not further worked than semimanufactured (1 code, General duty 10%)
- 7112: Waste and scrap of precious metal or of metal clad with precious metal; other waste and scrap containing precious metal or precious metal compounds, of a kind used principally for the recovery of precious metal other than goods of heading 8549 (4 codes, General duty Free)
- 7113: Articles of jewelry and parts thereof, of precious metal or of metal clad with precious metal (21 codes, General duty 5% to 13.5%)
- 7114: Articles of goldsmiths' or silversmiths' wares and parts thereof, of precious metal or of metal clad with precious metal (11 codes, General duty 2.7% to 7.9%)
- 7115: Other articles of precious metal or of metal clad with precious metal (7 codes, General duty Free to 4%)
- 7116: Articles of natural or cultured pearls, precious or semiprecious stones (natural, synthetic or reconstructed) (8 codes, General duty Free to 10.5%)
- 7117: Imitation jewelry (15 codes, General duty Free to 11%)
- 7118: Coin (5 codes, General duty Free)
Where it sits in the schedule
Chapter 71 is in Section XIV of the Harmonized System, pearls, precious stones and metals (chapters 71 to 71). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.