HTS Heading 7303
Tubes, pipes and hollow profiles, of cast iron
All 3 HTS codes under heading 7303 (tubes, pipes and hollow profiles, of cast iron), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7303
- 7303.00.00 Tubes, pipes and hollow profiles, of cast iron: General Free; Special none; Column 2 33%.
- 7303.00.00.30 Soil pipe (under: Tubes, pipes and hollow profiles, of cast iron) (kg).
- 7303.00.00.60 Pressure pipe with an inside diameter of less than 356 mm (kg).
- 7303.00.00.90 Other (under: Tubes, pipes and hollow profiles, of cast iron) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.