HTS Heading 7302
Railway or tramway track construction material of iron or steel, the following: rails, check-rails and rack rails, switch blades, crossing frogs, point rods and other crossing pieces, sleepers (cross-ties), fish-plates, chairs, chair wedges, sole plates (base plates), rail clips, bedplates, ties and other material specialized for jointing or fixing rails
All 15 HTS codes under heading 7302 (railway or tramway track construction), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7302
- 7302 Railway or tramway track construction material of iron or steel, the following: rails, check-rails and rack rails, switch blades, crossing frogs, point rods and other crossing pieces, sleepers (cross-ties), fish-plates, chairs, chair wedges, sole plates (base plates), rail clips, bedplates, ties and other material specialized for jointing or fixing rails.
- 7302.10 Rails (under: Railway or tramway track construction material of iron or steel, the following: rails, check-rails and rack rails, switch blades, crossing frogs, point rods and other crossing pieces, sleepers (cross-ties), fish-plates, chairs, chair wedges, sole plates (base plates), rail clips, bedplates, ties and other material specialized for jointing or fixing rails).
- 7302.10.10 Of iron or nonalloy steel (under: Rails): General Free; Special none; Column 2 1%.
- 7302.10.10.10 Standard tee rails over 30 kg per meter (kg).
- 7302.10.10.15 Over 30 kg per meter (under: Other) (kg).
- 7302.10.10.25 Other (under: Other) (kg).
- 7302.10.10.35 Standard tee rails over 30 kg per meter (kg).
- 7302.10.10.45 Over 30 kg per meter (under: Other) (kg).
- 7302.10.10.55 Other (under: Other) (kg).
- 7302.10.10.65 Railway rails for rerolling (under: Used) (kg).
- 7302.10.10.75 Other (under: Used) (kg).
- 7302.10.50 Of alloy steel (under: Rails): General Free; Special none; Column 2 9%.
- 7302.10.50.20 New (under: Of alloy steel) (kg).
- 7302.10.50.40 Railway rails for rerolling (under: Used) (kg).
- 7302.10.50.60 Other (under: Used) (kg).
- 7302.30.00.00 Switch blades, crossing frogs, point rods and other crossing pieces (kg): General Free; Special none; Column 2 45%.
- 7302.40.00.00 Fish-plates and sole plates (under: Railway or tramway track construction material of iron or steel, the following: rails, check-rails and rack rails, switch blades, crossing frogs, point rods and other crossing pieces, sleepers (cross-ties), fish-plates, chairs, chair wedges, sole plates (base plates), rail clips, bedplates, ties and other material specialized for jointing or fixing rails) (kg): General Free; Special none; Column 2 2%.
- 7302.90 Other (under: Railway or tramway track construction material of iron or steel, the following: rails, check-rails and rack rails, switch blades, crossing frogs, point rods and other crossing pieces, sleepers (cross-ties), fish-plates, chairs, chair wedges, sole plates (base plates), rail clips, bedplates, ties and other material specialized for jointing or fixing rails).
- 7302.90.10.00 Sleepers (cross-ties) (under: Other) (kg): General Free; Special none; Column 2 2%.
- 7302.90.90.00 Other (under: Other) (kg): General Free; Special none; Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.