HTS Heading 7305
Other tubes and pipes (for example, welded, riveted or similarly closed), having circular cross sections, the external diameter of which exceeds 406.4 mm, of iron or steel
All 21 HTS codes under heading 7305 (other tubes and pipes), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 7305
- 7305 Other tubes and pipes (for example, welded, riveted or similarly closed), having circular cross sections, the external diameter of which exceeds 406.4 mm, of iron or steel.
- 7305.11 Longitudinally submerged arc welded.
- 7305.11.10 Of iron or nonalloy steel (under: Longitudinally submerged arc welded): General Free; Special none; Column 2 5.5%.
- 7305.11.10.30 With an external diameter exceeding 406.4 mm but not exceeding 609.6 mm (kg).
- 7305.11.10.60 With an external diameter exceeding 609.6 mm (kg).
- 7305.11.50.00 Of alloy steel (under: Longitudinally submerged arc welded) (kg): General Free; Special none; Column 2 10%.
- 7305.12 Other, longitudinally welded (under: Line pipe of a kind used for oil or gas pipelines).
- 7305.12.10 Of iron or nonalloy steel (under: Other, longitudinally welded): General Free; Special none; Column 2 5.5%.
- 7305.12.10.30 With an external diameter exceeding 406.4 mm but not exceeding 609.6 mm (kg).
- 7305.12.10.60 With an external diameter exceeding 609.6 mm (kg).
- 7305.12.50.00 Of alloy steel (under: Other, longitudinally welded) (kg): General Free; Special none; Column 2 10%.
- 7305.19 Other (under: Line pipe of a kind used for oil or gas pipelines).
- 7305.19.10 Of iron or nonalloy steel (under: Other): General Free; Special none; Column 2 5.5%.
- 7305.19.10.30 With an external diameter exceeding 406.4 mm but not exceeding 609.6 mm (kg).
- 7305.19.10.60 With an external diameter exceeding 609.6 mm (kg).
- 7305.19.50.00 Of alloy steel (under: Other) (kg): General Free; Special none; Column 2 10%.
- 7305.20 Casing of a kind used in drilling for oil or gas.
- 7305.20.20.00 Threaded or coupled (under: Of iron or nonalloy steel) (kg): General Free; Special none; Column 2 20%.
- 7305.20.40.00 Other (under: Of iron or nonalloy steel) (kg): General Free; Special none; Column 2 1%.
- 7305.20.60.00 Threaded or coupled (under: Of alloy steel) (kg): General Free; Special none; Column 2 28%.
- 7305.20.80.00 Other (under: Of alloy steel) (kg): General Free; Special none; Column 2 8.5%.
- 7305.31 Longitudinally welded (under: Other, welded).
- 7305.31.20.00 Tapered pipes and tubes of steel principally used as parts of illuminating articles (kg): General Free; Special none; Column 2 45%.
- 7305.31.40.00 Of iron or nonalloy steel (under: Other) (kg): General Free; Special none; Column 2 5.5%.
- 7305.31.60 Of alloy steel (under: Other): General Free; Special none; Column 2 10%.
- 7305.31.60.10 Of stainless steel (under: Of alloy steel) (kg).
- 7305.31.60.90 Other (under: Of alloy steel) (kg).
- 7305.39 Other (under: Other, welded).
- 7305.39.10.00 Of iron or nonalloy steel (under: Other) (kg): General Free; Special none; Column 2 5.5%.
- 7305.39.50.00 Of alloy steel (under: Other) (kg): General Free; Special none; Column 2 10%.
- 7305.90 Other (under: Other tubes and pipes (for example, welded, riveted or similarly closed), having circular cross sections, the external diameter of which exceeds 406.4 mm, of iron or steel).
- 7305.90.10.00 Of iron or nonalloy steel (under: Other) (kg): General Free; Special none; Column 2 5.5%.
- 7305.90.50.00 Of alloy steel (under: Other) (kg): General Free; Special none; Column 2 10%.
From MFG Calcs data: Steel pipe and tube
U.S. imports of steel pipe and tube (headings 7304, 7305, 7306) came to $6.93B in 2025, with $1.78B in calculated duty: an effective duty of 25.6%, every duty included.
Effective duty in Sep 2026: 44.3%, against 39.1% in Sep 2025.
Largest sources in 2025: South Korea $1.12B at 25.5% effective duty; Canada $902M at 20.6% effective duty; Mexico $652M at 23.2% effective duty; Germany $460M at 23.0% effective duty; Japan $400M at 20.1% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.