HTS Heading 7306

Other tubes, pipes and hollow profiles (for example, open seamed or welded, riveted or similarly closed), of iron or steel

All 68 HTS codes under heading 7306 (other tubes), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7306

  • 7306 Other tubes, pipes and hollow profiles (for example, open seamed or welded, riveted or similarly closed), of iron or steel.
  • 7306.11.00 Welded, of stainless steel (under: Line pipe of a kind used for oil or gas pipelines): General Free; Special none; Column 2 10%.
  • 7306.11.00.10 With an outside diameter not exceeding 114.3 mm (kg).
  • 7306.11.00.50 With an outside diameter exceeding 114.3 mm (kg).
  • 7306.19 Other (under: Line pipe of a kind used for oil or gas pipelines).
  • 7306.19.10 Of iron or nonalloy steel (under: Other): General Free; Special none; Column 2 5.5%.
  • 7306.19.10.10 With an outside diameter not exceeding 114.3 mm (kg).
  • 7306.19.10.50 With an outside diameter exceeding 114.3 mm (kg).
  • 7306.19.51 Of alloy steel (under: Other): General Free; Special none; Column 2 10%.
  • 7306.19.51.10 With an outside diameter not exceeding 114.3 mm (kg).
  • 7306.19.51.50 With an outside diameter exceeding 114.3 mm (kg).
  • 7306.21 Welded of stainless steel (under: Casing and tubing of a kind used in drilling for oil or gas).
  • 7306.21.30.00 Threaded or coupled (under: Casing) (kg): General Free; Special none; Column 2 28%.
  • 7306.21.40.00 Other (under: Casing) (kg): General Free; Special none; Column 2 8.5%.
  • 7306.21.80 Tubing (under: Welded of stainless steel): General Free; Special none; Column 2 10%.
  • 7306.21.80.10 Imported with coupling (under: Tubing) (kg).
  • 7306.21.80.50 Other (under: Tubing) (kg).
  • 7306.29 Other (under: Casing and tubing of a kind used in drilling for oil or gas).
  • 7306.29.10 Threaded or coupled (under: Of iron or nonalloy steel): General Free; Special none; Column 2 20%.
  • 7306.29.10.30 Imported with coupling (under: Threaded or coupled) (kg).
  • 7306.29.10.90 Other (under: Threaded or coupled) (kg).
  • 7306.29.20.00 Other (under: Of iron or nonalloy steel) (kg): General Free; Special none; Column 2 1%.
  • 7306.29.31.00 Threaded or coupled (under: Other) (kg): General Free; Special none; Column 2 28%.
  • 7306.29.41.00 Other (under: Other) (kg): General Free; Special none; Column 2 8.5%.
  • 7306.29.60 Of iron or nonalloy steel (under: Tubing): General Free; Special none; Column 2 5.5%.
  • 7306.29.60.10 Imported with coupling (under: Of iron or nonalloy steel) (kg).
  • 7306.29.60.50 Other (under: Of iron or nonalloy steel) (kg).
  • 7306.29.81 Other (under: Tubing): General Free; Special none; Column 2 10%.
  • 7306.29.81.10 Imported with coupling (under: Other) (kg).
  • 7306.29.81.50 Other (under: Other) (kg).
  • 7306.30 Other, welded, of circular cross section, of iron or nonalloy steel.
  • 7306.30.10 Having a wall thickness of less than 1.65 mm: General Free; Special none; Column 2 25%.
  • 7306.30.10.10 Internally coated or lined with a non-electrically insulating material, suitable for use as electrical conduit (kg).
  • 7306.30.10.90 Other (under: Having a wall thickness of less than 1.65 mm) (kg).
  • 7306.30.30.00 Tapered steel pipes and tubes principally used as parts of illuminating articles (kg): General Free; Special none; Column 2 45%.
  • 7306.30.50 Other (under: Having a wall thickness of 1.65 mm or more): General Free; Special none; Column 2 5.5%.
  • 7306.30.50.10 Suitable for use in boilers, superheaters, heat exchangers, condensers, refining furnaces and feedwater heaters, whether or not cold drawn (kg).
  • 7306.30.50.15 Other, cold-drawn (under: Other) (kg).
  • 7306.30.50.20 Other, cold-rolled (cold-reduced) with a wall thickness not exceeding 2.54 mm (kg).
  • 7306.30.50.26 With an outside diameter not exceeding 50.8 mm (kg).
  • 7306.30.50.27 With an outside diameter exceeding 50.8 mm but not exceeding 114.3 mm (kg).
  • 7306.30.50.28 Internally coated or lined with a non-electrically insulating material, suitable for use as electrical conduit (kg).
  • 7306.30.50.31 With an outside diameter not exceeding 50.8 mm (kg).
  • 7306.30.50.33 With an outside diameter exceeding 50.8 mm but not exceeding 114.3 mm (kg).
  • 7306.30.50.35 Tube and pipe hollows for redrawing (kg).
  • 7306.30.50.41 With an outside diameter not exceeding 50.8 mm (kg).
  • 7306.30.50.43 With an outside diameter exceeding 50.8 mm but not exceeding 114.3 mm (kg).
  • 7306.30.50.56 With an outside diameter not exceeding 50.8 mm (kg).
  • 7306.30.50.57 With an outside diameter exceeding 50.8 mm but not exceeding 114.3 mm (kg).
  • 7306.30.50.85 Galvanized (under: With an outside diameter exceeding 114.3 mm but not exceeding 406.4 mm) (kg).
  • 7306.30.50.90 Other (under: With an outside diameter exceeding 114.3 mm but not exceeding 406.4 mm) (kg).
  • 7306.40 Other, welded, of circular cross section, of stainless steel.
  • 7306.40.10 Having a wall thickness of less than 1.65 mm: General Free; Special none; Column 2 36%.
  • 7306.40.10.10 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
  • 7306.40.10.15 Other (under: Containing more than 0.5 percent by weight of nickel) (kg).
  • 7306.40.10.90 Other (under: Having a wall thickness of less than 1.65 mm) (kg).
  • 7306.40.50 Having a wall thickness of 1.65 mm or more: General Free; Special none; Column 2 11%.
  • 7306.40.50.05 Of high-nickel alloy steel (under: Having a wall thickness of 1.65 mm or more) (kg).
  • 7306.40.50.15 Suitable for use in boilers, superheaters, heat exchangers, condensers, refining furnaces and feedwater heaters, whether or not cold-drawn (kg).
  • 7306.40.50.40 Containing more than 0.5 percent but less than 24 percent by weight of nickel (kg).
  • 7306.40.50.42 Containing less than 15 percent by weight of chromium (kg).
  • 7306.40.50.44 Other (under: Other) (kg).
  • 7306.40.50.62 Containing more than 1.5 percent but less than 5 percent by weight of molybdenum (kg).
  • 7306.40.50.64 Other (under: Containing more than 0.5 percent but less than 24 percent by weight of nickel) (kg).
  • 7306.40.50.80 Other (under: With an outside diameter not exceeding 114.3 mm) (kg).
  • 7306.40.50.85 Containing more than 0.5 percent but less than 24 percent by weight of nickel (kg).
  • 7306.40.50.90 Other (under: With an outside diameter exceeding 114.3 mm but not exceeding 406.4 mm) (kg).
  • 7306.50 Other, welded, of circular cross section, of other alloy steel.
  • 7306.50.10.00 Having a wall thickness of less than 1.65 mm (kg): General Free; Special none; Column 2 35%.
  • 7306.50.30.00 Tapered pipes and tubes of steel principally used as parts of illuminating articles (kg): General Free; Special none; Column 2 45%.
  • 7306.50.50 Other (under: Having a wall thickness of 1.65 mm or more): General Free; Special none; Column 2 10%.
  • 7306.50.50.10 Suitable for use in boilers, superheaters, heat exchangers, condensers, refining furnaces and feedwater heaters, whether or not cold-drawn (kg).
  • 7306.50.50.30 Other, cold-drawn or cold-rolled (cold- reduced) (kg).
  • 7306.50.50.50 With an outside diameter not exceeding 114.3 mm (kg).
  • 7306.50.50.70 With an outside diameter exceeding 114.3 mm but not exceeding 406.4 mm (kg).
  • 7306.61 Of square or rectangular cross section.
  • 7306.61.10.00 Of iron or nonalloy steel (under: Having a wall thickness of 4 mm or more) (kg): General Free; Special none; Column 2 1%.
  • 7306.61.30.00 Of alloy steel (under: Having a wall thickness of 4 mm or more) (kg): General Free; Special none; Column 2 28%.
  • 7306.61.50.00 Of iron or nonalloy steel (under: Having a wall thickness of less than 4 mm) (kg): General Free; Special none; Column 2 25%.
  • 7306.61.70 Of alloy steel (under: Having a wall thickness of less than 4 mm): General Free; Special none; Column 2 35%.
  • 7306.61.70.30 Of stainless steel (under: Of alloy steel) (kg).
  • 7306.61.70.60 Other (under: Of alloy steel) (kg).
  • 7306.69 Of other noncircular cross section.
  • 7306.69.10.00 Of iron or nonalloy steel (under: Having a wall thickness of 4 mm or more) (kg): General Free; Special none; Column 2 1%.
  • 7306.69.30.00 Of alloy steel (under: Having a wall thickness of 4 mm or more) (kg): General Free; Special none; Column 2 28%.
  • 7306.69.50.00 Of iron or nonalloy steel (under: Having a wall thickness of less than 4 mm) (kg): General Free; Special none; Column 2 25%.
  • 7306.69.70 Of alloy steel (under: Having a wall thickness of less than 4 mm): General Free; Special none; Column 2 35%.
  • 7306.69.70.30 Of stainless steel (under: Of alloy steel) (kg).
  • 7306.69.70.60 Other (under: Of alloy steel) (kg).
  • 7306.90 Other (under: Other tubes, pipes and hollow profiles (for example, open seamed or welded, riveted or similarly closed), of iron or steel).
  • 7306.90.10.00 Of iron or nonalloy steel (under: Other) (kg): General Free; Special none; Column 2 5.5%.
  • 7306.90.50.00 Of alloy steel (under: Other) (kg): General Free; Special none; Column 2 10%.

From MFG Calcs data: Steel pipe and tube

U.S. imports of steel pipe and tube (headings 7304, 7305, 7306) came to $6.93B in 2025, with $1.78B in calculated duty: an effective duty of 25.6%, every duty included.

Effective duty in Sep 2026: 44.3%, against 39.1% in Sep 2025.

Largest sources in 2025: South Korea $1.12B at 25.5% effective duty; Canada $902M at 20.6% effective duty; Mexico $652M at 23.2% effective duty; Germany $460M at 23.0% effective duty; Japan $400M at 20.1% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.