HTS Heading 7307
Tube or pipe fittings (for example, couplings, elbows, sleeves), of iron or steel
All 39 HTS codes under heading 7307 (tube or pipe fittings), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.2%.
Every line of heading 7307
- 7307 Tube or pipe fittings (for example, couplings, elbows, sleeves), of iron or steel.
- 7307.11.00 Of nonmalleable cast iron (under: Cast fittings): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 7307.11.00.30 For threaded pipe (under: Of nonmalleable cast iron) (kg).
- 7307.11.00.45 For cast-iron soil pipe (under: Other) (kg).
- 7307.11.00.60 Other (under: Other) (kg).
- 7307.19 Other (under: Cast fittings).
- 7307.19.30 Ductile fittings (under: Other): General 5.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.19.30.40 Grooved-end fittings (including grooved couplings) (kg).
- 7307.19.30.60 Threaded (under: Other) (kg).
- 7307.19.30.70 With mechanical, push-on (rubber compression) or flanged joints attached (kg).
- 7307.19.30.85 Other (under: Other) (kg).
- 7307.19.90 Other (under: Other): General 6.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.19.90.30 Unions (under: Other) (kg).
- 7307.19.90.40 Grooved-end fittings (including grooved couplings) (kg).
- 7307.19.90.60 Threaded (under: Other) (kg).
- 7307.19.90.80 Other (under: Other) (kg).
- 7307.21 Flanges (under: Other, of stainless steel).
- 7307.21.10.00 Not machined, not tooled and not otherwise processed after forging (kg): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 34%.
- 7307.21.50.00 Other (under: Flanges) (kg): General 5.6%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.22 Threaded elbows, bends and sleeves.
- 7307.22.10.00 Sleeves (couplings) (under: Threaded elbows, bends and sleeves) (kg): General Free; Special none; Column 2 45%.
- 7307.22.50.00 Other (under: Threaded elbows, bends and sleeves) (kg): General 6.2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.23.00 Butt welding fittings (under: Other, of stainless steel): General 5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.23.00.30 Not machined, not tooled and not otherwise processed after forming (kg).
- 7307.23.00.90 Other (under: Butt welding fittings) (kg).
- 7307.29.00 Other (under: Other, of stainless steel): General 5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.29.00.30 Nipples (under: Other) (kg).
- 7307.29.00.90 Other (under: Other) (kg).
- 7307.91 Flanges (under: Other).
- 7307.91.10.00 Of iron or nonalloy steel (under: Not machined, not tooled and not otherwise processed after forging) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 7307.91.30.00 Of alloy steel (except stainless steel) (kg): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 33%.
- 7307.91.50 Other (under: Flanges): General 5.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.75% (JP); Column 2 45%.
- 7307.91.50.10 Of iron or nonalloy steel (under: With an inside diameter of less than 360 mm) (kg).
- 7307.91.50.30 Of alloy steel (except stainless steel) (kg).
- 7307.91.50.50 Of iron or nonalloy steel (under: With an inside diameter of 360 mm or more) (kg).
- 7307.91.50.70 Of alloy steel (except stainless steel) (kg).
- 7307.92 Threaded elbows, bends and sleeves.
- 7307.92.30 Sleeves (couplings) (under: Threaded elbows, bends and sleeves): General Free; Special none; Column 2 45%.
- 7307.92.30.10 Of iron or nonalloy steel (under: Sleeves (couplings)) (kg).
- 7307.92.30.30 Of alloy steel (except stainless steel) (kg).
- 7307.92.90.00 Other (under: Threaded elbows, bends and sleeves) (kg): General 6.2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.1% (JP); Column 2 45%.
- 7307.93 Butt welding fittings (under: Other).
- 7307.93.30 Of iron or nonalloy steel (under: With an inside diameter of less than 360 mm): General 6.2%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.93.30.10 Not machined, not tooled and not otherwise processed after forging (kg).
- 7307.93.30.40 Other (under: Of iron or nonalloy steel) (kg).
- 7307.93.60.00 Of alloy steel (except stainless steel) (kg): General 5.5%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.93.90 With an inside diameter of 360 mm or more: General 4.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.93.90.10 Not machined, not tooled and not otherwise processed after forging (kg).
- 7307.93.90.40 Other (under: Of iron or nonalloy steel) (kg).
- 7307.93.90.60 Of alloy steel (except stainless steel) (kg).
- 7307.99 Other (under: Other).
- 7307.99.10.00 Of iron or nonalloy steel (under: Not machined, not tooled and not otherwise processed after forging) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 7307.99.30.00 Of alloy steel (except stainless steel) (kg): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 33%.
- 7307.99.50 Other (under: Other): General 4.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7307.99.50.15 Nipples (under: Of iron or nonalloy steel) (kg).
- 7307.99.50.45 Other (under: Of iron or nonalloy steel) (kg).
- 7307.99.50.60 Of alloy steel (except stainless steel) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.