HTS Heading 7321
Stoves, ranges, grates, cookers (including those with subsidiary boilers for central heating), barbecues, braziers, gas rings, plate warmers and similar nonelectric domestic appliances, and parts thereof, of iron or steel
All 24 HTS codes under heading 7321 (stoves, ranges, grates), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.7%.
Every line of heading 7321
- 7321 Stoves, ranges, grates, cookers (including those with subsidiary boilers for central heating), barbecues, braziers, gas rings, plate warmers and similar nonelectric domestic appliances, and parts thereof, of iron or steel.
- 7321.11 For gas fuel or for both gas and other fuels.
- 7321.11.10 Portable (under: For gas fuel or for both gas and other fuels): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7321.11.10.30 Stoves or ranges (under: Portable) (No.).
- 7321.11.10.60 Other (under: Portable) (No.).
- 7321.11.30 Stoves or ranges (under: Other): General Free; Special none; Column 2 45%.
- 7321.11.30.10 Of a maximum width not exceeding 70 centimeters (No.).
- 7321.11.30.20 Of a maximum width exceeding 70 but not exceeding 80 centimeters (No.).
- 7321.11.30.50 Of a maximum width exceeding 80 centimeters (No.).
- 7321.11.60.00 Other (under: Other) (No.): General Free; Special none; Column 2 45%.
- 7321.12.00.00 For liquid fuel (under: Cooking appliances and plate warmers) (No.): General Free; Special none; Column 2 45%.
- 7321.19.00 Other, including appliances for solid fuel: General Free; Special none; Column 2 45%.
- 7321.19.00.20 Hibachis (under: Portable) (No.).
- 7321.19.00.40 Other (under: Portable) (No.).
- 7321.19.00.60 Of cast iron (under: Other) (No.).
- 7321.19.00.80 Other (under: Other) (No.).
- 7321.81 For gas fuel or for both gas and other fuels.
- 7321.81.10.00 Portable (under: For gas fuel or for both gas and other fuels) (No.): General 2.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7321.81.50.00 Other (under: For gas fuel or for both gas and other fuels) (No.): General Free; Special none; Column 2 45%.
- 7321.82 For liquid fuel (under: Other appliances).
- 7321.82.10.00 Portable (under: For liquid fuel) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7321.82.50.00 Other (under: For liquid fuel) (No.): General Free; Special none; Column 2 45%.
- 7321.89.00 Other, including appliances for solid fuel: General Free; Special none; Column 2 45%.
- 7321.89.00.10 Fireplace grates of cast iron (No.).
- 7321.89.00.50 Other (under: Other, including appliances for solid fuel) (No.).
- 7321.90 Parts (under: Stoves, ranges, grates, cookers (including those with subsidiary boilers for central heating), barbecues, braziers, gas rings, plate warmers and similar nonelectric domestic appliances, and parts thereof, of iron or steel).
- 7321.90.10.00 Cooking chambers, whether or not assembled (No., kg): General Free; Special none; Column 2 45%.
- 7321.90.20.00 Top surface panels with or without burners or controls (No., kg): General Free; Special none; Column 2 45%.
- 7321.90.40.00 Door assemblies, incorporating more than one of the following: inner panel, outer panel, window, insulation (No., kg): General Free; Special none; Column 2 45%.
- 7321.90.50.00 Other (under: Of articles in subheading 7321.11.30) (No., kg): General Free; Special none; Column 2 45%.
- 7321.90.60 Other (under: Parts): General Free; Special none; Column 2 45%.
- 7321.90.60.40 Shelving and racks for cooking ovens (No., kg).
- 7321.90.60.60 Other (under: Of cooking appliances and plate warmers) (No., kg).
- 7321.90.60.90 Other (under: Other) (No., kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.