HTS Heading 7322

Radiators for central heating, not electrically heated, and parts thereof, of iron or steel; air heaters and hot air distributors (including distributors which can also distribute fresh or conditioned air), not electrically heated, incorporating a motor-driven fan or blower, and parts thereof, of iron or steel

All 5 HTS codes under heading 7322 (radiators for central heating), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7322

  • 7322 Radiators for central heating, not electrically heated, and parts thereof, of iron or steel; air heaters and hot air distributors (including distributors which can also distribute fresh or conditioned air), not electrically heated, incorporating a motor-driven fan or blower, and parts thereof, of iron or steel.
  • 7322.11.00.00 Of cast iron (under: Radiators and parts thereof) (No.): General Free; Special none; Column 2 45%.
  • 7322.19.00.00 Other (under: Radiators and parts thereof) (No.): General Free; Special none; Column 2 45%.
  • 7322.90.00 Other, including parts (under: Radiators for central heating, not electrically heated, and parts thereof, of iron or steel; air heaters and hot air distributors (including distributors which can also distribute fresh or conditioned air), not electrically heated, incorporating a motor-driven fan or blower, and parts thereof, of iron or steel): General Free; Special none; Column 2 45%.
  • 7322.90.00.15 Air heaters, not electrically heated, incorporating a motor-driven fan or blower (No., kg).
  • 7322.90.00.30 Hot air distributors, not electrically heated, incorporating a motor-driven fan or blower (No., kg).
  • 7322.90.00.45 Parts of air heaters and hot air distributors (No.).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.