HTS Heading 7324
Sanitary ware and parts thereof, of iron or steel
All 6 HTS codes under heading 7324 (sanitary ware and parts thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.4%.
Every line of heading 7324
- 7324 Sanitary ware and parts thereof, of iron or steel.
- 7324.10.00 Sinks and wash basins, of stainless steel: General 3.4%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7324.10.00.10 Stainless steel sinks with one or more drawn bowls (basins) (No.).
- 7324.10.00.50 Other (under: Sinks and wash basins, of stainless steel) (No.).
- 7324.21 Of cast iron, whether or not enamelled.
- 7324.21.10.00 Coated or plated with precious metal (No.): General Free; Special none; Column 2 20%.
- 7324.21.50.00 Other (under: Of cast iron, whether or not enamelled) (No.): General Free; Special none; Column 2 40%.
- 7324.29.00.00 Other (under: Baths) (No.): General Free; Special none; Column 2 40%.
- 7324.90.00.00 Other, including parts (under: Sanitary ware and parts thereof, of iron or steel) (No.): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.