HTS Heading 7323
Table, kitchen or other household articles and parts thereof, of iron or steel; iron or steel wool; pot scourers and scouring or polishing pads, gloves and the like, of iron or steel
All 25 HTS codes under heading 7323 (table), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.2%.
Every line of heading 7323
- 7323 Table, kitchen or other household articles and parts thereof, of iron or steel; iron or steel wool; pot scourers and scouring or polishing pads, gloves and the like, of iron or steel.
- 7323.10.00.00 Iron or steel wool; pot scourers and scouring or polishing pads, gloves and the like (kg): General Free; Special none; Column 2 22¢/kg + 30%.
- 7323.91 Of cast iron, not enameled (under: Other).
- 7323.91.10.00 Coated or plated with precious metal (No., kg): General Free; Special none; Column 2 20%.
- 7323.91.50 Other (under: Of cast iron, not enameled): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7323.91.50.20 Bakeware (cookware not suitable for stove top use) (No., kg).
- 7323.91.50.40 Other (under: Other) (No., kg).
- 7323.92.00 Of cast iron, enameled (under: Other): General Free; Special none; Column 2 35.5%.
- 7323.92.00.20 Bakeware (cookware not suitable for stove top use) (No., kg).
- 7323.92.00.40 Other (under: Of cast iron, enameled) (No., kg).
- 7323.93.00 Of stainless steel (under: Other): General 2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7323.93.00.15 Teakettles (under: Cooking and kitchen ware) (No., kg).
- 7323.93.00.35 Bakeware (cookware not suitable for stove top use) (No., kg).
- 7323.93.00.45 Other (under: Cooking ware) (No., kg).
- 7323.93.00.60 Kitchen ware (under: Other) (No., kg).
- 7323.93.00.80 Other (under: Of stainless steel) (No., kg).
- 7323.94.00 Of iron (other than cast iron) or steel, enameled: General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35.5%.
- 7323.94.00.10 Teakettles (under: Of steel) (No., kg).
- 7323.94.00.21 Bakeware (cookware not suitable for stove top use) (No., kg).
- 7323.94.00.26 Other (under: Cooking ware) (No., kg).
- 7323.94.00.30 Kitchen ware (under: Other) (No., kg).
- 7323.94.00.40 Other (under: Cooking and kitchen ware) (No., kg).
- 7323.94.00.80 Other (under: Of iron (other than cast iron) or steel, enameled) (No., kg).
- 7323.99 Other (under: Other).
- 7323.99.10.00 Coated or plated with silver (under: Coated or plated with precious metal) (No., kg): General Free; Special none; Column 2 50%.
- 7323.99.30.00 Other (under: Coated or plated with precious metal) (No., kg): General 8.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 7323.99.50 Of tinplate (under: Not coated or plated with precious metal): General Free; Special none; Column 2 40%.
- 7323.99.50.30 Kitchen or tableware suitable for food or drink contact (No., kg).
- 7323.99.50.60 Other (under: Of tinplate) (No., kg).
- 7323.99.70.00 Cookingware (under: Other) (No., kg): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7323.99.90 Other (under: Other): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7323.99.90.30 Kitchen or tableware suitable for food or drink contact (No., kg).
- 7323.99.90.40 Gates for confining children or pets (No.).
- 7323.99.90.80 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.