HTS Heading 7326
Other articles of iron or steel
All 24 HTS codes under heading 7326 (other articles of iron or steel), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8.6%.
Every line of heading 7326
- 7326 Other articles of iron or steel.
- 7326.11.00.00 Grinding balls and similar articles for mills (kg): General Free; Special none; Column 2 27.5%.
- 7326.19.00 Other (under: Forged or stamped, but not further worked): General 2.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7326.19.00.10 Forged (under: Other) (kg).
- 7326.19.00.80 Other (under: Other) (kg).
- 7326.20.00 Articles of iron or steel wire: General 3.9%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7326.20.00.10 Belts and belting (under: Articles of iron or steel wire) (kg).
- 7326.20.00.20 Garment hangers (under: Articles of iron or steel wire) (No.).
- 7326.20.00.30 Sod staples, U staples, irrigation staples, ground staples, and ground pins (No.).
- 7326.20.00.40 Double loop bar ties and double loop wire ties (No.).
- 7326.20.00.55 Paint roller frames (under: Articles of iron or steel wire) (No.).
- 7326.20.00.90 Other (under: Articles of iron or steel wire) (No.).
- 7326.90 Other (under: Other articles of iron or steel).
- 7326.90.10.00 Of tinplate (under: Other) (No., kg): General Free; Special none; Column 2 45%.
- 7326.90.25.00 Cable or inner wire for caliper and cantilever brakes and casing therefor, whether or not cut to length (kg): General Free; Special none; Column 2 45%.
- 7326.90.35.00 Containers of a kind normally carried on the person, in the pocket or in the handbag (doz.): General 7.8%; Special Free (AU,BH, CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 110%.
- 7326.90.45.00 Horse and mule shoes (under: Other) (kg): General Free; Special none; Column 2 10%.
- 7326.90.60.00 Coated or plated with precious metal (No., kg): General 8.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 65%.
- 7326.90.86 Other (under: Other): General 2.9%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7326.90.86.05 Rods for electrical grounding (kg).
- 7326.90.86.10 Laminated goods consisting of two or more flat-rolled sheets of iron or steel held together with an adhesive or having a core of non-metallic material (kg).
- 7326.90.86.30 Hangers and similar supports for tubes and pipes (kg).
- 7326.90.86.35 Fence posts, studded with corrugations, knobs, studs, notches or similar protrusions, with or without anchor plates (kg).
- 7326.90.86.45 Barbed tape (under: Other) (kg).
- 7326.90.86.60 Ladders (under: Other) (No.).
- 7326.90.86.75 Paint roller frames (other than of iron or steel wire) (No.).
- 7326.90.86.76 Metal handles for brooms, mops, paint applicators and similar products (No.).
- 7326.90.86.77 Burial caskets (under: Other) (No.).
- 7326.90.86.88 Other (under: Other) (kg).
From MFG Calcs data: Iron and steel castings and articles
U.S. imports of iron and steel castings and articles (headings 7325, 7326) came to $5.98B in 2025, with $2.07B in calculated duty: an effective duty of 34.5%, every duty included.
Effective duty in Sep 2026: 48.2%, against 47.4% in Sep 2025.
Largest sources in 2025: China $1.64B at 66.2% effective duty; Mexico $1.10B at 11.6% effective duty; Canada $609M at 16.0% effective duty; India $484M at 27.5% effective duty; Germany $254M at 31.2% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.