HTS Heading 7404

Copper waste and scrap

All 10 HTS codes under heading 7404 (copper waste and scrap), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7404

  • 7404.00 Copper waste and scrap.
  • 7404.00.30 Spent anodes; waste and scrap with a copper content of less than 94 percent by weight: General Free; Special none; Column 2 6%.
  • 7404.00.30.20 Of refined copper (under: Spent anodes; waste and scrap with a copper content of less than 94 percent by weight) (kg).
  • 7404.00.30.45 Containing more than 0.3 percent of lead (kg).
  • 7404.00.30.55 Other (under: Of copper-zinc base alloys (brass)) (kg).
  • 7404.00.30.65 Of copper-tin base alloys (bronze) (kg).
  • 7404.00.30.90 Other (under: Of copper alloys) (kg).
  • 7404.00.60 Other (under: Copper waste and scrap): General Free; Special none; Column 2 6%.
  • 7404.00.60.20 Of refined copper (under: Other) (kg).
  • 7404.00.60.45 Containing more than 0.3 percent of lead (kg).
  • 7404.00.60.55 Other (under: Of copper-zinc base alloys (brass)) (kg).
  • 7404.00.60.65 Of copper-tin base alloys (bronze) (kg).
  • 7404.00.60.90 Other (under: Of copper alloys) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.