HTS Heading 7405

Master alloys of copper

All 3 HTS codes under heading 7405 (master alloys of copper), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7405

  • 7405.00 Master alloys of copper.
  • 7405.00.10.00 Containing by weight 5 percent or more but not more than 15 percent of phosphorus (kg): General Free; Special none; Column 2 12%.
  • 7405.00.60 Other (under: Master alloys of copper): General Free; Special none; Column 2 28%.
  • 7405.00.60.30 Beryllium copper master alloy (kg).
  • 7405.00.60.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.