HTS Heading 7603
Aluminum powders and flakes
All 2 HTS codes under heading 7603 (aluminum powders and flakes), with their duty rates from the 2026 HTS Revision 23. General duty 3.9% to 5%.
Every line of heading 7603
- 7603 Aluminum powders and flakes.
- 7603.10.00.00 Powders of non-lamellar structure (kg): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7603.20.00.00 Powders of lamellar structure; flakes (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 11%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.