HTS Heading 7602

Aluminum waste and scrap

All 5 HTS codes under heading 7602 (aluminum waste and scrap), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 7602

  • 7602.00.00 Aluminum waste and scrap: General Free; Special none; Column 2 Free.
  • 7602.00.00.35 Recyclable used beverage containers (kg).
  • 7602.00.00.45 Recyclable aluminum auto and truck wheels (kg).
  • 7602.00.00.55 Recyclable aluminum from industrial processes, including turnings, borings, shavings, filings, clippings and chips (kg).
  • 7602.00.00.65 Other recyclable aluminum (under: Aluminum waste and scrap) (kg).
  • 7602.00.00.75 Other (under: Aluminum waste and scrap) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.