HTS Heading 7606
Aluminum plates, sheets and strip, of a thickness exceeding 0.2 mm
All 19 HTS codes under heading 7606 (aluminum plates, sheets and strip), with their duty rates from the 2026 HTS Revision 23. General duty 2.7% to 6.5%.
Every line of heading 7606
- 7606 Aluminum plates, sheets and strip, of a thickness exceeding 0.2 mm.
- 7606.11 Of aluminum, not alloyed (under: Rectangular (including square)).
- 7606.11.30 Not clad (under: Of aluminum, not alloyed): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.5%.
- 7606.11.30.30 With a thickness of more than 6.3 mm (kg).
- 7606.11.30.60 With a thickness of 6.3 mm or less (kg).
- 7606.11.60.00 Clad (under: Of aluminum, not alloyed) (kg): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9.5%.
- 7606.12 Of aluminum alloys (under: Rectangular (including square)).
- 7606.12.30 Not clad (under: Of aluminum alloys): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.5%.
- 7606.12.30.15 High-strength heat-treatable alloys of a kind described in statistical note 6 to this chapter (kg).
- 7606.12.30.25 Heat-treatable industrial alloys of a kind described in statistical note 7 to this chapter (kg).
- 7606.12.30.35 Other (under: With a thickness of more than 6.3 mm) (kg).
- 7606.12.30.45 Body stock (under: Aluminum can stock) (kg).
- 7606.12.30.55 Lid stock (under: Aluminum can stock) (kg).
- 7606.12.30.91 Heat-treatable industrial alloys of a kind described in statistical note 7 to this chapter (kg).
- 7606.12.30.96 Other (under: Other) (kg).
- 7606.12.60.00 Clad (under: Of aluminum alloys) (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 7606.91 Of aluminum, not alloyed (under: Other).
- 7606.91.30 Not clad (under: Of aluminum, not alloyed): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.5%.
- 7606.91.30.55 With a thickness of more than 6.3 mm (kg).
- 7606.91.30.95 With a thickness of 6.3 mm or less (kg).
- 7606.91.60 Clad (under: Of aluminum, not alloyed): General 2.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 9.5%.
- 7606.91.60.55 With a thickness of more than 6.3 mm (kg).
- 7606.91.60.95 With a thickness of 6.3 mm or less (kg).
- 7606.92 Of aluminum alloys (under: Other).
- 7606.92.30 Not clad (under: Of aluminum alloys): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.5%.
- 7606.92.30.25 With a thickness of more than 6.3 mm (kg).
- 7606.92.30.35 With a thickness of 6.3 mm or less (kg).
- 7606.92.60 Clad (under: Of aluminum alloys): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 7606.92.60.55 With a thickness of more than 6.3 mm (kg).
- 7606.92.60.95 With a thickness of 6.3 mm or less (kg).
From MFG Calcs data: Aluminum semi-finished products
U.S. imports of aluminum semi-finished products (headings 7604, 7605, 7606, 7607, 7608) came to $7.58B in 2025, with $2.49B in calculated duty: an effective duty of 32.8%, every duty included.
Effective duty in Sep 2026: 51.3%, against 43.9% in Sep 2025.
Largest sources in 2025: Canada $1.52B at 28.9% effective duty; South Korea $1.04B at 32.9% effective duty; China $484M at 66.9% effective duty; Thailand $394M at 24.2% effective duty; Germany $322M at 34.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.