HTS Heading 7607
Aluminum foil (whether or not printed, or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0.2 mm
All 11 HTS codes under heading 7607 (aluminum foil), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.8%.
Every line of heading 7607
- 7607 Aluminum foil (whether or not printed, or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0.2 mm.
- 7607.11 Rolled but not further worked.
- 7607.11.30.00 Of a thickness not exceeding 0.01 mm (kg): General 5.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7607.11.60 Of a thickness exceeding 0.01 mm: General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7607.11.60.10 Boxed aluminum foil weighing not more than 11.3 kg (kg, m2).
- 7607.11.60.90 Other (under: Of a thickness exceeding 0.01 mm) (kg, m2).
- 7607.11.90 Other (under: Rolled but not further worked): General 3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.5%.
- 7607.11.90.30 Body stock (under: Aluminum can stock) (kg).
- 7607.11.90.60 Lid stock (under: Aluminum can stock) (kg).
- 7607.11.90.90 Other (under: Other) (kg).
- 7607.19 Other (under: Not backed).
- 7607.19.10.00 Etched capacitor foil (under: Other) (kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 7607.19.30.00 Cut to shape, of a thickness not exceeding 0.15 mm (kg): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7607.19.60.00 Other (under: Other) (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 13.5%.
- 7607.20 Backed (under: Aluminum foil (whether or not printed, or backed with paper, paperboard, plastics or similar backing materials) of a thickness (excluding any backing) not exceeding 0.2 mm).
- 7607.20.10.00 Covered or decorated with a character, design, fancy effect or pattern (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 22.5%.
- 7607.20.50.00 Other (under: Backed) (kg): General Free; Special none; Column 2 23%.
From MFG Calcs data: Aluminum semi-finished products
U.S. imports of aluminum semi-finished products (headings 7604, 7605, 7606, 7607, 7608) came to $7.58B in 2025, with $2.49B in calculated duty: an effective duty of 32.8%, every duty included.
Effective duty in Sep 2026: 51.3%, against 43.9% in Sep 2025.
Largest sources in 2025: Canada $1.52B at 28.9% effective duty; South Korea $1.04B at 32.9% effective duty; China $484M at 66.9% effective duty; Thailand $394M at 24.2% effective duty; Germany $322M at 34.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.