HTS Heading 7609
Aluminum tube or pipe fittings (for example, couplings, elbows, sleeves)
The HTS code under heading 7609 (aluminum tube or pipe fittings), with its duty rates from the 2026 HTS Revision 23. General duty 5.7%.
Every line of heading 7609
- 7609.00.00.00 Aluminum tube or pipe fittings (for example, couplings, elbows, sleeves) (kg): General 5.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.