HTS Heading 7608
Aluminum tubes and pipes
All 4 HTS codes under heading 7608 (aluminum tubes and pipes), with their duty rates from the 2026 HTS Revision 23. General duty 5.7%.
Every line of heading 7608
- 7608 Aluminum tubes and pipes.
- 7608.10.00 Of aluminum, not alloyed (under: Aluminum tubes and pipes): General 5.7%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7608.10.00.30 Seamless (under: Of aluminum, not alloyed) (kg).
- 7608.10.00.90 Other (under: Of aluminum, not alloyed) (kg).
- 7608.20.00 Of aluminum alloys (under: Aluminum tubes and pipes): General 5.7%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 7608.20.00.30 Seamless (under: Of aluminum alloys) (kg).
- 7608.20.00.90 Other (under: Of aluminum alloys) (kg).
From MFG Calcs data: Aluminum semi-finished products
U.S. imports of aluminum semi-finished products (headings 7604, 7605, 7606, 7607, 7608) came to $7.58B in 2025, with $2.49B in calculated duty: an effective duty of 32.8%, every duty included.
Effective duty in Sep 2026: 51.3%, against 43.9% in Sep 2025.
Largest sources in 2025: Canada $1.52B at 28.9% effective duty; South Korea $1.04B at 32.9% effective duty; China $484M at 66.9% effective duty; Thailand $394M at 24.2% effective duty; Germany $322M at 34.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.