HTS Heading 7614
Stranded wire, cables, plaited bands and the like, including slings and similar articles, of aluminum, not electrically insulated
All 6 HTS codes under heading 7614 (stranded wire, cables), with their duty rates from the 2026 HTS Revision 23. General duty 4.9% to 5.7%.
Every line of heading 7614
- 7614 Stranded wire, cables, plaited bands and the like, including slings and similar articles, of aluminum, not electrically insulated.
- 7614.10 With steel core (under: Stranded wire, cables, plaited bands and the like, including slings and similar articles, of aluminum, not electrically insulated).
- 7614.10.10.00 Not fitted with fittings and not made up into articles (kg): General 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
- 7614.10.50.00 Fitted with fittings or made up into articles (kg): General 4.9%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7614.90 Other (under: Stranded wire, cables, plaited bands and the like, including slings and similar articles, of aluminum, not electrically insulated).
- 7614.90.20 Electrical conductors (under: Not fitted with fittings and not made up into articles): General 4.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 7614.90.20.30 With a cross-sectional area less than 240 mm² (kg).
- 7614.90.20.60 With a cross-sectional area greater than or equal to 240 mm² (kg).
- 7614.90.40.00 Other (under: Not fitted with fittings and not made up into articles) (kg): General 4.9%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 35%.
- 7614.90.50.00 Fitted with fittings or made up into articles (kg): General 5.7%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.