HTS Heading 7615

Table, kitchen or other household articles and parts thereof, of aluminum; pot scourers and scouring or polishing pads, gloves and the like, of aluminum; sanitary ware and parts thereof, of aluminum

All 13 HTS codes under heading 7615 (table), with their duty rates from the 2026 HTS Revision 23. General duty 3.1% to 3.8%.

Every line of heading 7615

  • 7615 Table, kitchen or other household articles and parts thereof, of aluminum; pot scourers and scouring or polishing pads, gloves and the like, of aluminum; sanitary ware and parts thereof, of aluminum.
  • 7615.10 Table, kitchen or other household articles and parts thereof; pot scourers and scouring or polishing pads, gloves and the like.
  • 7615.10.11.00 Pot scourers and scouring or polishing pads, gloves and the like (kg): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45.5%.
  • 7615.10.20 Cast (under: Enameled or glazed or containing nonstick interior finishes): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45.5%.
  • 7615.10.20.15 Bakeware (cookware not suitable for stove top use) (No., kg).
  • 7615.10.20.25 Other (under: Cast) (No., kg).
  • 7615.10.30 Other (under: Enameled or glazed or containing nonstick interior finishes): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45.5%.
  • 7615.10.30.15 Bakeware (cookware not suitable for stove top use) (No., kg).
  • 7615.10.30.25 Other (under: Other) (No., kg).
  • 7615.10.50 Cast (under: Not enameled or glazed and not containing nonstick interior finishes): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45.5%.
  • 7615.10.50.20 Bakeware (cookware not suitable for stove top use) (No., kg).
  • 7615.10.50.40 Other (under: Cast) (No., kg).
  • 7615.10.71 Other (under: Not enameled or glazed and not containing nonstick interior finishes): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45.5%.
  • 7615.10.71.25 Containers suitable for food preparation, baking, reheating or storage, 0.04 mm or more but not over 0.22 mm in thickness (No., kg).
  • 7615.10.71.30 Bakeware (cookware not suitable for stove top use) (No., kg).
  • 7615.10.71.55 Other (under: Other cookware) (No., kg).
  • 7615.10.71.80 Other (under: Other) (No., kg).
  • 7615.10.91.00 Other (under: Other) (kg): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45.5%.
  • 7615.20.00.00 Sanitary ware and parts thereof (kg): General 3.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.