HTS Heading 8007

Other articles of tin

All 7 HTS codes under heading 8007 (other articles of tin), with their duty rates from the 2026 HTS Revision 23. General duty 2.1% to 3%.

Every line of heading 8007

  • 8007.00 Other articles of tin.
  • 8007.00.10 Articles not elsewhere specified or included of a type used for household, table or kitchen use; toilet and sanitary wares; all the foregoing not coated or plated with precious metal: General 2.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 8007.00.10.10 Suitable for food or beverage service (No.).
  • 8007.00.10.50 Other (under: Articles not elsewhere specified or included of a type used for household, table or kitchen use; toilet and sanitary wares; all the foregoing not coated or plated with precious metal) (No.).
  • 8007.00.20.00 Tin plates, sheets and strip, of a thickness exceeding 0.2 mm (kg): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8007.00.31.00 Tin foil (whether or not printed or backed with paper, paperboard, plastics or similar backing materials), of a thickness (excluding any backing) not exceeding 0.2 mm (kg): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8007.00.32.00 Powders and flakes (under: Other articles of tin) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8007.00.40.00 Tin tubes, pipes and tube or pipe fittings (for example, couplings, elbows, sleeves) (kg): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8007.00.50.00 Other (under: Other articles of tin) (kg): General 2.8%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.