HTS Heading 8101

Tungsten (wolfram) and articles thereof, including waste and scrap

All 6 HTS codes under heading 8101 (tungsten (wolfram) and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty 2.8% to 7%.

Every line of heading 8101

  • 8101 Tungsten (wolfram) and articles thereof, including waste and scrap.
  • 8101.10.00.00 Powders (under: Tungsten (wolfram) and articles thereof, including waste and scrap) (kg, W kg): General 7%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 58%.
  • 8101.94.00.00 Unwrought tungsten, including bars and rods obtained simply by sintering (kg): General 6.6%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 8101.96.00.00 Wire (under: Other) (kg): General 4.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 8101.97.00.00 Waste and scrap (under: Other) (kg, W kg): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 8101.99 Other (under: Other).
  • 8101.99.10.00 Bars and rods, other than those obtained simply by sintering, profiles, plates, sheets, strip and foil (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60%.
  • 8101.99.80.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.

From MFG Calcs data: Titanium and tungsten

U.S. imports of titanium and tungsten (headings 8101, 8108) came to $1.45B in 2025, with $120M in calculated duty: an effective duty of 8.3%, every duty included.

Effective duty in Sep 2026: 9.6%, against 5.0% in Sep 2025.

Largest sources in 2025: Japan $419M at 7.2% effective duty; China $140M at 34.0% effective duty; United Kingdom $105M at 3.0% effective duty; Germany $103M at 2.8% effective duty; Canada $97.4M at 1.8% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.