HTS Heading 8104

Magnesium and articles thereof, including waste and scrap

All 5 HTS codes under heading 8104 (magnesium and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%.

Every line of heading 8104

  • 8104 Magnesium and articles thereof, including waste and scrap.
  • 8104.11.00.00 Containing at least 99.8 percent by weight of magnesium (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 100%.
  • 8104.19.00.00 Other (under: Unwrought magnesium) (kg, Mg kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 60.5%.
  • 8104.20.00.00 Waste and scrap (under: Magnesium and articles thereof, including waste and scrap) (kg): General Free; Special none; Column 2 Free.
  • 8104.30.00.00 Raspings, turnings and granules, graded according to size; powders (kg, Mg kg): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60.5%.
  • 8104.90.00.00 Other (under: Magnesium and articles thereof, including waste and scrap) (kg, Mg kg): General 14.8¢/kg on magnesium content + 3.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 88¢/kg on magnesium content + 20%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.