HTS Heading 8103
Tantalum and articles thereof, including waste and scrap
All 5 HTS codes under heading 8103 (tantalum and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.4%.
Every line of heading 8103
- 8103 Tantalum and articles thereof, including waste and scrap.
- 8103.20.00 Unwrought tantalum, including bars and rods obtained simply by sintering; powders: General 2.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 8103.20.00.30 Powders (under: Unwrought tantalum, including bars and rods obtained simply by sintering; powders) (kg).
- 8103.20.00.90 Other (under: Unwrought tantalum, including bars and rods obtained simply by sintering; powders) (kg).
- 8103.30.00.00 Waste and scrap (under: Tantalum and articles thereof, including waste and scrap) (kg): General Free; Special none; Column 2 Free.
- 8103.91.00.00 Crucibles (under: Other) (kg): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8103.99.00.00 Other (under: Other) (kg): General 4.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.