HTS Heading 8106
Bismuth and articles thereof, including waste and scrap
All 2 HTS codes under heading 8106 (bismuth and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 8106
- 8106 Bismuth and articles thereof, including waste and scrap.
- 8106.10.00.00 Containing more than 99.99 percent of bismuth, by weight (kg): General Free; Special none; Column 2 7.5%.
- 8106.90.00.00 Other (under: Bismuth and articles thereof, including waste and scrap) (kg): General Free; Special none; Column 2 7.5%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.