HTS Heading 8108
Titanium and articles thereof, including waste and scrap
All 12 HTS codes under heading 8108 (titanium and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 15%.
Every line of heading 8108
- 8108 Titanium and articles thereof, including waste and scrap.
- 8108.20.00 Unwrought titanium; powders (under: Titanium and articles thereof, including waste and scrap): General 15%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 8108.20.00.10 Sponge (under: Unwrought titanium; powders) (kg).
- 8108.20.00.15 Powders (under: Other) (kg).
- 8108.20.00.30 Ingots (under: Other) (kg).
- 8108.20.00.95 Other (under: Other) (kg).
- 8108.30.00.00 Waste and scrap (under: Titanium and articles thereof, including waste and scrap) (kg): General Free; Special none; Column 2 Free.
- 8108.90 Other (under: Titanium and articles thereof, including waste and scrap).
- 8108.90.30 Articles of titanium (under: Other): General 5.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8108.90.30.30 Castings (under: Articles of titanium) (kg).
- 8108.90.30.60 Other (under: Articles of titanium) (kg).
- 8108.90.60 Other (under: Other): General 15%; Special Free (A*,AU,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8108.90.60.20 Blooms, sheet bars, and slabs (kg).
- 8108.90.60.31 Other bars, rods, profiles and wire (kg).
- 8108.90.60.45 Plates, sheets, strips and foil (kg).
- 8108.90.60.60 Tubes and pipes (under: Other) (kg).
- 8108.90.60.75 Other (under: Other) (kg).
From MFG Calcs data: Titanium and tungsten
U.S. imports of titanium and tungsten (headings 8101, 8108) came to $1.45B in 2025, with $120M in calculated duty: an effective duty of 8.3%, every duty included.
Effective duty in Sep 2026: 9.6%, against 5.0% in Sep 2025.
Largest sources in 2025: Japan $419M at 7.2% effective duty; China $140M at 34.0% effective duty; United Kingdom $105M at 3.0% effective duty; Germany $103M at 2.8% effective duty; Canada $97.4M at 1.8% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.