HTS Heading 8109
Zirconium and articles thereof, including waste and scrap
All 6 HTS codes under heading 8109 (zirconium and articles thereof), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.2%.
Every line of heading 8109
- 8109 Zirconium and articles thereof, including waste and scrap.
- 8109.21.00.00 Containing less than 1 part hafnium to 500 parts zirconium by weight (kg): General 4.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 8109.29.00.00 Other (under: Unwrought zirconium; powders) (kg): General 4.2%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 8109.31.00.00 Containing less than 1 part hafnium to 500 parts zirconium by weight (kg): General Free; Special none; Column 2 Free.
- 8109.39.00.00 Other (under: Waste and scrap) (kg): General Free; Special none; Column 2 Free.
- 8109.91.00.00 Containing less than 1 part hafnium to 500 parts zirconium by weight (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8109.99.00.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.