HTS Heading 8204
Hand-operated spanners and wrenches (including torque meter wrenches but not including tap wrenches); socket wrenches, with or without handles, drives or extensions; base metal parts thereof
All 4 HTS codes under heading 8204 (hand-operated spanners and wrenches), with their duty rates from the 2026 HTS Revision 23. General duty 9%.
Every line of heading 8204
- 8204 Hand-operated spanners and wrenches (including torque meter wrenches but not including tap wrenches); socket wrenches, with or without handles, drives or extensions; base metal parts thereof.
- 8204.11.00 Nonadjustable, and parts thereof: General 9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8204.11.00.30 Open-end, box and combination open-end and box wrenches (No.).
- 8204.11.00.60 Other (including parts) (under: Nonadjustable, and parts thereof) (No.).
- 8204.12.00.00 Adjustable, and parts thereof (No.): General 9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8204.20.00.00 Socket wrenches, with or without handles, drives and extensions, and parts thereof (No.): General 9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
From MFG Calcs data: Hand tools
U.S. imports of hand tools (headings 8203, 8204, 8205) came to $2.70B in 2025, with $669M in calculated duty: an effective duty of 24.8%, every duty included.
Effective duty in Sep 2026: 20.8%, against 32.5% in Sep 2025.
Largest sources in 2025: Taiwan $808M at 16.7% effective duty; China $732M at 49.7% effective duty; Vietnam $297M at 17.4% effective duty; India $145M at 22.3% effective duty; Germany $137M at 13.5% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.