HTS Heading 8205
Handtools (including glass cutters) not elsewhere specified or included; blow torches and similar self-contained torches; vises, clamps and the like, other than accessories for and parts of machine tools or water-jet cutting machines; anvils; portable forges; hand- or pedal-operated grinding wheels with frameworks; base metal parts thereof
All 29 HTS codes under heading 8205 (handtools), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7.2%, some per unit.
Every line of heading 8205
- 8205 Handtools (including glass cutters) not elsewhere specified or included; blow torches and similar self-contained torches; vises, clamps and the like, other than accessories for and parts of machine tools or water-jet cutting machines; anvils; portable forges; hand- or pedal-operated grinding wheels with frameworks; base metal parts thereof.
- 8205.10.00.00 Drilling, threading or tapping tools, and parts thereof (No.): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8205.20 Hammers and sledge hammers, and parts thereof.
- 8205.20.30.00 With heads not over 1.5 kg each (No.): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8205.20.60.00 With heads over 1.5 kg each (under: Hammers and sledge hammers, and parts thereof) (No.): General Free; Special none; Column 2 20%.
- 8205.30 Planes, chisels, gouges and similar cutting tools for working wood, and parts thereof.
- 8205.30.30.00 With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium (No.): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 8205.30.60.00 Other (including parts) (under: Planes, chisels, gouges and similar cutting tools for working wood, and parts thereof) (No.): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8205.40.00.00 Screwdrivers, and parts thereof (No.): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.1% (JP); Column 2 45%.
- 8205.51 Household tools, and parts thereof.
- 8205.51.15.00 Carving and butcher steels, with or without handles (No.): General Free; Special none; Column 2 8¢ each + 45%.
- 8205.51.30 Other (including parts) (under: Of iron or steel): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8205.51.30.30 Kitchen and table implements (under: Other (including parts)) (No.).
- 8205.51.30.60 Other (including parts) (under: Other (including parts)) (No.).
- 8205.51.45.00 Of copper (under: Household tools, and parts thereof) (No.): General Free; Special none; Column 2 40%.
- 8205.51.60.00 Of aluminum (under: Household tools, and parts thereof) (kg): General 2.2¢/kg + 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 19¢/kg + 40%.
- 8205.51.75.00 Other (under: Household tools, and parts thereof) (No.): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8205.59 Other (under: Other handtools (including glass cutters) and parts thereof).
- 8205.59.10.00 Pipe tools, and parts thereof (No.): General 7.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.6% (JP); Column 2 45%.
- 8205.59.20.00 Powder-actuated handtools, and parts thereof (No.): General Free; Special none; Column 2 27.5%.
- 8205.59.30 Crowbars, track tools and wedges, and parts thereof: General Free; Special none; Column 2 3¢/kg.
- 8205.59.30.10 Crowbars (under: Crowbars, track tools and wedges, and parts thereof) (kg, No.).
- 8205.59.30.80 Other (under: Crowbars, track tools and wedges, and parts thereof) (kg, No.).
- 8205.59.45.00 Caulking guns (under: Of iron or steel) (No.): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8205.59.55 Other (under: Of iron or steel): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8205.59.55.05 Single edge razor blades other than for shaving (No.).
- 8205.59.55.10 Other (under: Edged handtools) (No.).
- 8205.59.55.60 Other (including parts) (under: Other) (No.).
- 8205.59.60.00 Of copper (under: Other) (No.): General Free; Special none; Column 2 40%.
- 8205.59.70.00 Of aluminum (under: Other) (kg): General 1.5¢/kg + 3.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 19¢/kg + 40%.
- 8205.59.80.00 Other (under: Other) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 8205.60.00.00 Blow torches and similar self-contained torches, and parts thereof (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8205.70.00 Vises, clamps and the like, and parts thereof: General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 8205.70.00.30 Pipe (under: Vises) (No.).
- 8205.70.00.60 Other (under: Vises) (No.).
- 8205.70.00.90 Other (including parts) (under: Vises, clamps and the like, and parts thereof) (No.).
- 8205.90 Other, including sets of articles of two or more subheadings of this heading.
- 8205.90.10.00 Anvils; portable forges; hand- or pedal-operated grinding wheels with frameworks; base metal parts thereof (No.): General Free; Special none; Column 2 6%.
- 8205.90.60.00 Sets of articles of two or more of the foregoing subheadings (pcs): General The rate of duty applicable to that article in the set subject to the highest rate of duty; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 The rate of duty applicable to that article in the set subject to the highest rate of duty.
From MFG Calcs data: Hand tools
U.S. imports of hand tools (headings 8203, 8204, 8205) came to $2.70B in 2025, with $669M in calculated duty: an effective duty of 24.8%, every duty included.
Effective duty in Sep 2026: 20.8%, against 32.5% in Sep 2025.
Largest sources in 2025: Taiwan $808M at 16.7% effective duty; China $732M at 49.7% effective duty; Vietnam $297M at 17.4% effective duty; India $145M at 22.3% effective duty; Germany $137M at 13.5% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.