HTS Heading 8207

Interchangeable tools for handtools, whether or not power operated, or for machine-tools (for example, for pressing, stamping, punching, tapping, threading, drilling, boring, broaching, milling, turning or screwdriving), including dies for drawing or extruding metal, and rock drilling or earth boring tools; base metal parts thereof

All 48 HTS codes under heading 8207 (interchangeable tools for handtools), with their duty rates from the 2026 HTS Revision 23. General duty 1.6% to 8.4%.

Every line of heading 8207

  • 8207 Interchangeable tools for handtools, whether or not power operated, or for machine-tools (for example, for pressing, stamping, punching, tapping, threading, drilling, boring, broaching, milling, turning or screwdriving), including dies for drawing or extruding metal, and rock drilling or earth boring tools; base metal parts thereof.
  • 8207.13.00.00 With working part of cermets (under: Rock drilling or earth boring tools, and parts thereof) (No.): General 3.6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8207.19 Other, including parts (under: Rock drilling or earth boring tools, and parts thereof).
  • 8207.19.30 With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium: General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8207.19.30.30 Percussion rock drill bits (under: With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium) (No.).
  • 8207.19.30.60 Rotary rock drill bits, core bits and reamers (No.).
  • 8207.19.30.90 Other (under: Other) (No.).
  • 8207.19.60 Other (under: Other, including parts): General 2.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8207.19.60.30 Percussion rock drill bits (under: Other) (No.).
  • 8207.19.60.65 With working part of diamonds (No.).
  • 8207.19.60.70 Other (under: Rotary rock drill bits, core bits and reamers) (No.).
  • 8207.19.60.90 Other (under: Other) (No.).
  • 8207.20.00 Dies for drawing or extruding metal, and parts thereof: General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 8207.20.00.30 Diamond wire drawing dies (under: Dies for drawing or extruding metal, and parts thereof) (No., kg).
  • 8207.20.00.40 Other dies (under: Dies for drawing or extruding metal, and parts thereof) (No., kg).
  • 8207.20.00.70 Parts (under: Dies for drawing or extruding metal, and parts thereof) (No., kg).
  • 8207.30 Tools for pressing, stamping or punching, and parts thereof.
  • 8207.30.30 Suitable for cutting metal, and parts thereof: General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.85% (JP); Column 2 60%.
  • 8207.30.30.20 Tools (under: Suitable for cutting metal, and parts thereof) (No., kg).
  • 8207.30.30.50 Parts (under: Suitable for cutting metal, and parts thereof) (No., kg).
  • 8207.30.60 Not suitable for cutting metal, and parts thereof: General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8207.30.60.32 Stamping dies not suitable for cutting metal (No., kg).
  • 8207.30.60.62 Metal forming dies, including thread-rolling dies (No., kg).
  • 8207.30.60.92 Other tools (under: Not suitable for cutting metal, and parts thereof) (No., kg).
  • 8207.30.60.95 Parts (under: Not suitable for cutting metal, and parts thereof) (No., kg).
  • 8207.40 Tools for tapping or threading, and parts thereof.
  • 8207.40.30.00 With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium (No.): General 5.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.85% (JP); Column 2 60%.
  • 8207.40.60.00 Other (under: Tools for tapping or threading, and parts thereof) (No.): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 8207.50 Tools for drilling, other than for rock drilling, and parts thereof.
  • 8207.50.20 With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium: General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8207.50.20.30 Masonry drills (under: With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium) (No.).
  • 8207.50.20.45 Brad point (under: Twist drills) (No.).
  • 8207.50.20.55 Other (under: Twist drills) (No.).
  • 8207.50.20.70 For woodworking (under: Other) (No.).
  • 8207.50.20.80 Other (under: Other) (No.).
  • 8207.50.40 Suitable for cutting metal, and parts thereof: General 8.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 8207.50.40.30 Twist drills (under: Suitable for cutting metal, and parts thereof) (No.).
  • 8207.50.40.60 Other (under: Suitable for cutting metal, and parts thereof) (No.).
  • 8207.50.60.00 For handtools, and parts thereof (No.): General 5.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8207.50.80.00 Other (under: Not suitable for cutting metal, and parts thereof) (No.): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8207.60.00 Tools for boring or broaching, and parts thereof: General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8207.60.00.30 Broaches (under: Tools for boring or broaching, and parts thereof) (No.).
  • 8207.60.00.35 Reamers, except gun reamers (under: Tools for boring or broaching, and parts thereof) (No.).
  • 8207.60.00.61 Other (including parts thereof) (No.).
  • 8207.70 Tools for milling, and parts thereof.
  • 8207.70.30 With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium: General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8207.70.30.30 End milling cutters (under: With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium) (No.).
  • 8207.70.30.40 Router bits for woodworking (under: With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium) (No.).
  • 8207.70.30.60 Other (under: With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium) (No.).
  • 8207.70.60 Other (under: Tools for milling, and parts thereof): General 2.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8207.70.60.30 End milling cutters (under: Other) (No.).
  • 8207.70.60.40 Router bits not suitable for cutting metal (No.).
  • 8207.70.60.60 Other (including parts) (under: Other) (No.).
  • 8207.80 Tools for turning (under: Interchangeable tools for handtools, whether or not power operated, or for machine-tools (for example, for pressing, stamping, punching, tapping, threading, drilling, boring, broaching, milling, turning or screwdriving), including dies for drawing or extruding metal, and rock drilling or earth boring tools; base metal parts thereof).
  • 8207.80.30.00 With cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium (No.): General 4.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8207.80.60.00 Other (under: Tools for turning) (No.): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8207.90 Other interchangeable tools, and parts thereof.
  • 8207.90.15.00 Files and rasps, including rotary files and rasps, and parts thereof (doz.): General 1.6%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15%.
  • 8207.90.30 Cutting tools with cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium: General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 8207.90.30.30 Hobs and other gear cutting tools (No.).
  • 8207.90.30.75 Cutterheads with interchangeable tools (No.).
  • 8207.90.30.80 Other (under: For woodworking) (No.).
  • 8207.90.30.85 Other (under: Cutting tools with cutting part containing by weight over 0.2 percent of chromium, molybdenum, or tungsten or over 0.1 percent of vanadium) (No.).
  • 8207.90.45.00 Suitable for cutting metal, and parts thereof (No.): General 4.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
  • 8207.90.60.00 For handtools, and parts thereof (No.): General 4.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 8207.90.75 Other (under: Not suitable for cutting metal, and parts thereof): General 3.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 8207.90.75.45 Cutterheads with interchangeable tools (No.).
  • 8207.90.75.85 Other (under: Other) (No.).

From MFG Calcs data: Cutting tools and inserts

U.S. imports of cutting tools and inserts (headings 8207, 8208, 8209) came to $4.48B in 2025, with $702M in calculated duty: an effective duty of 15.7%, every duty included.

Effective duty in Sep 2026: 14.1%, against 22.1% in Sep 2025.

Largest sources in 2025: Germany $762M at 11.8% effective duty; Japan $617M at 9.8% effective duty; China $530M at 50.7% effective duty; South Korea $311M at 9.7% effective duty; Canada $272M at 2.4% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.